Advice Generation
(Scheduling Information)
Calculation of scheduling times for reference points
Runway threshold
Final approach fix
Feeder fix or initial approach fix
Coordination points (delay sharing)
Time to gain time to lose for reference points
Departure times for regional flights
Adaptation of (departure) slot start times
June 2005, page 12
commercial-in-confidence
© Barco Orthogon AG
Advice Generation (Delay Sharing)
ACC1
ACC3
ACC4
APP
COP1 =
Entry Fix
COP2
COP3
COP4 =
IAF/Feeder Fix
ACC2
Delay Sharing
distribution of delay along
upstream En-Route sectors
Assignment of delay
configurable absorption
capacity for each sector
Possible Strategies
As late as possible
Balanced distribution
June 2005, page 13
commercial-in-confidence
© Barco Orthogon AG
Advice Generation (Probe Sequences)
What-If functionality: Calculation of probe sequences
based on controller inputs, alternative routes or
probe trajectories.
Concepts will be evaluated during Gate-To-Gate trials
Probe sequences for direct routings
Delay absorption through alternative routes
Could be used to coordinate User Preferred Trajectories
June 2005, page 14
commercial-in-confidence
© Barco Orthogon AG
Calculation of an advice trajectory with scheduling
times for reference points as constraints
Speed during descent
Top of descent advice
Calculation of flight duration for regional flights
Holding indication
Routing information
Advice Trajectory
June 2005, page 15
commercial-in-confidence
© Barco Orthogon AG
Controller Input
Change sequence
Insert flight or time slot
Request re-sequencing
Remove flight
Update flight parameters
Change priority
Change acceptance rate
Change strategy
ACC-APP coordination
Controller-Pilot coordination
June 2005, page 16
commercial-in-confidence
© Barco Orthogon AG
Monitoring and Adaptation
OSYRIS Monitoring Functions
Automatic updates of the estimates based on actual
position data
Conformance monitoring (deviation alert)
Passed waypoint notification
Area enter leave notification
Automatic Sequence Adaptations
Automatic adaptation of scheduling times
Configurable trigger for re-sequencing
June 2005, page 17
commercial-in-confidence
© Barco Orthogon AG
Departure Manager: Functionality
DMAN calculates earliest possible take-off times
The DMAN process is event driven based on ATC
instructions:
En-Route Clearance, Engine Start-Up, Push-Back, Taxi,
Line-Up, Take-Off.
The departure planning process considers:
wake vortex separations,
SID dependent separations
intersection take-off
The DMAN incorporates arrival times (for runways in
mixed mode operations).
ATC controller is able to intervene
June 2005, page 18
commercial-in-confidence
© Barco Orthogon AG
Departure Manager:
Optimization Objectives
Maximum throughput
maximum runway usage
Minimum taxi-out delays
reduction of unnecessary delays at holding points and
during taxing
reduction of fuel consumption between engine
startup and take-off
Maximum slot compliance
maximum compliance to target departure times
provided by airlines or flow control
The DMAN allows the combination and weighting of
optimization criteria
June 2005, page 19
commercial-in-confidence
© Barco Orthogon AG
Collaborative Decision Making
June 2005, page 20
commercial-in-confidence
© Barco Orthogon AG
Barco – Inform CDM Initiative
Inform Product: Turnaround Manager
Provides ground handling systems for airlines:
KLM, SAS, AirFrance, British Airways, …
CDM Initiative (presented ATC Maastricht 2006):
Interfaces between Arrival Manager, Departure Manager and
Turnaround Manger
June 2005, page 21
commercial-in-confidence
© Barco Orthogon AG