Phase SmartPathTM SLS 4000 Airservices Australia GBAS Program
Phase 2
(GBAS CAT I Approval I SLS-FAA SDA
(Prototype Trial)
CAT--
ILS overlay, Sydney)
CASA Part 171 approval
Phase 3
(B fit V lid ti Proof of new Phase 4
Benefits Validation –
new concepts, Sydney)
ICAO SARPs published
concepts
(Contribution to CAT-III
SARPs)
p
Phase 5
2009 2010 2011 2012 2013 2014 2015+
(Network Expansion)
CAAC Seminar, October 2009
Progressive Minima Step-down
3,000 ft / 8,000m to 10,000m → VOR/DME minima → Cat-I 200ft / 800m
CAAC Seminar, October 2009
Airservices Australia Regulatory Environment
CAAC Seminar, October 2009
Airservices Australia Operating Certificates
CAAC Seminar, October 2009
To request CASA approval to include
GBAS in CASR Part 171 Certificate
GBAS
CAAC Seminar, October 2009
Safety Argument
GBAS CAT I
h ill b
• ILS look-alike
• Not used in Missed
Approach
• Risk no greater than
ILS
approaches will be
acceptably safe
pp
• 1 GBAS for multiple
runways
• Mixed landing mode
• AsA SMS compliance
• Risks reduced as far
as acceptable
Design Implementation In Operational
Service
Transition
CAAC Seminar, October 2009
Sydney GBAS Project Scope
Maintenance &
Support
Installation
GLS
procedures
Technical training
TechCert
ATC ATC procedures &
system update
design &
charting
training
Flight Planning
NOTAMS
CAAC Seminar, October 2009
Deliverables
Program Management
ATC
• Operational requirements
• GLS instrument flight
procedures
Safety
• SCARD
• Safety Plan
P M t Safety
• SCARD
• Safety Plan
Operational
• Operational requirements
• GLS instrument flight
g g procedures
• PMP
• WBS and schedules
• Project reports
• ATC procedures
• AIP / NOTAM procedures
• ATC training
• Hazard analysis
• Safety Case
• Updates to Operations Manual
• Operational risk assessment
Program Management
• PMP
• WBS and schedules
• Project reports
• Hazard analysis
• Safety Cases (Design &
Implementation)
• Updates to Operations Manual
• ATC procedures
• ATC system updates
• AIP / NOTAM procedures
GBAS CAT-I
S i
j p
• Operational risk assessment • ATC training
System Engineering
S t i t Facility Installations
• Environ mgmt plan
OH&S l
Services
System Management
D li bl
Facility Installations
• Environ mgmt plan
• System requirements
• System design
• Siting, installation and facility
support specification
OEM Deliverables
• Equipment manual
• Technical data package
• SDA
• plan
• Site construction doc
• Site lease
• Civil works contract
• System requirements
• System design documents
• Siting, installation and facility
support specification
OEM Deliverables
• Equipment manual
• Technical data package
• SDA
• OH&S plan
• Site construction doc
• Site lease
• T&E plan
• Civil works • System management plan
• Airways engineering instructions
• TechCert
• OEM training
• OEM support
• Cut-over plan
• AsA works plan
• Installation inspections / ground tests
• Site acceptance test
• Operational Test & Evaluation
(OT&E)
• System management plan
• Airways engineering instructions
• OEM training
• OEM support
contract
• RadHaz and RF interference reports
• Cut-over plan
• AsA works plan
• Radhaz report I t ll ti i ti / dt t
• OT&E reports
• Flight test
• Commissioning document
• TechCert
• OT&E reports
• Installation inspections ground tests
• Site acceptance test
• Flight test
• Commissioning document
CAAC Seminar, October 2009
Australia Regulatory Approval Process
(GBAS Ground Facility)