• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-13 19:36来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

cloth moistened with methyl-ethyl-ketone.       
 Dry.       
74-20 3) Check ignition harness clamps for security and spark plug and magneto terminals for tight connection. 100  X X X 0 NOTE 1

NOTE 1 : If a 100-hr. inspection has been carried out during the last 3 months, do not perform the operations identified with a "0" unless the annual inspection replaces a 100-hr. inspection. For US registered aircraft, perform all operations.
AHAA
Validity : S / N 1 - 9999 05-20 01Page 243
(IA) JUN 01
 

ATA OPERATIONS Area INSPECTIONS
   1st
25 hrs 50
hrs 100
hrs Major Ann. Other
76-00 ENGINE CONTROLS       
76-00 General       
76-00 1) Check travel and visually inspect attach fittings and routing of controls : 000   X X 0 NOTE 1
 - propeller governor,
- alternate air,
- mixture,
- throttle.       
76-00 NOTE : Make sure that the powerplant stops are reached before the control unit stops. 000   X X 0 NOTE 1
76-00 2) Ensure that there is no slack, and that the control friction knob on the pedestal is
effective. 200    X X 
77-00 ENGINE INDICATING       
77-00 General       
77-00 1) Visually inspect the attach fittings, the
connections and markings of the engine indicating instruments - refer to 200    X X 
 31-10-03 201.       
77-00 2) Visually inspect routing and condition of attach fittings, lines, connections and
sensors of : 000    X X 
 - tachometer control system,
- inlet pressure and fuel flow/pressure
system.       
77-00 3) Visually inspect routing and condition of attach fittings, wires, connections and
sensors of : 000    X X 
 - cylinder head temperature C. H.T. system       
 (if installed),
- exhaust gas temperature E.G.T. system       
 (if installed).       
77-10 Power       
77-10 1) Replace the inlet pressure filter - refer
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 1(96)