NOTE 1 : If a 100-hr. inspection has been carried out during the last 3 months, do not perform the operations identified with a "0" unless the annual inspection replaces a 100-hr. inspection. For US registered aircraft, perform all operations.
AHAA
Validity : S / N 1 - 9999 05-20-01Page 225
(IA) JUN 01
ATA OPERATIONS Area INSPECTIONS
1st
25 hrs 50
hrs 100
hrs Major Ann. Other
34-00 2) Visually inspect the antennas (if installed). 200 X X X X
34-00 3) Visually inspect the cables of the antennas 200
(if installed), check attach fittings and check for routing and interference.
34-00 4) Check VFR equipment (if installed). 200 X
NOTE : Must be performed by an
approved radio center in
compliance with the regulation in force in the country of use.
(Examples :
- FAR Part 91.411 and 91.413 :
24 months,
- GSAC Instruction bulletin
P-41-15, Ed. 1 dated
September 2000 :
. operational test plus flight check every 4 years maximum,
. check on test bench every
6 years for equipment with
French type approval prior
to January 1, 1980 - refer to
GSAC Instruction bulletin
P-04-30.).
34-00 5) Check IFR equipment (if installed). 200 X
NOTE : Must be performed by an
approved radio center in
compliance with the regulation in force in the country of use.
(Examples :
- FAR Part 91.411 and 91.413 :
24 months,
- GSAC Instruction bulletin
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 1(79)