曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
25 hrs 50
hrs 100
hrs Major Ann. Other
21-55 8) Visually inspect the vapor cycle cooling compressor and the support (if installed) -refer to the latest issue of KEITH MM/IPC 100 X x x x x x x x x
1 0 NOTE 1
No. 20-0101 SM.
21-55 9) Check the belt of the vapor cycle cooling compressor (if installed) for condition and tension - refer to 21-55-01 201. 100 X X X 0 NOTE 1
Check the tension of a new belt after the first 25 operating hours.
22-00 AUTOFLIGHT
22-10 Autopilot (if installed)
22-10 1) Remove the servo-actuators of the
autopilot (if installed), check setting and
inspect for corrosion - refer to 200 X 1000 hrs
22-11-00 201 or 22-12-00 201 or
22-12-03 401 or 22-12-04 401 or
22-12-06 401. Install the servo-actuators.
22-10 2) Visually inspect the supports, levers,
attachments of the autopilot (if installed)
servo-actuators. Inspect servo-actuator
links to flight control linkages. 200 X 1000 hrs
23-00 COMMUNICATIONS
23-10 Speech communications
23-10 1) Visually inspect the racks, radio sets and control units of the communication systems 200
(if installed), check the wirings for correct routing, security and interference.
23-10 2) Visually inspect the antennas (if installed). 200
23-10 3) Visually inspect the antenna cables (if
installed), check for security, routing and interference. 200
23-60 Static dischargers
23-60 1) Visually inspect the static dischargers and bonding braids (if installed) for condition and security on the flaps, ailerons and stabilizers. If doubtful, check continuity and resistance - refer to 23-60-00 201. 000 X
NOTE 1 : If a 100-hr. inspection has been carried out during the last 3 months, do not perform the operations identified with a "0" unless the annual inspection replaces a 100-hr. inspection. For US registered aircraft, perform all operations.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 1(61)