ATA OPERATIONS INSPECTIONS
Area 1st
25 hrs 50
hrs 100
hrs Major Ann. Other
12-10 3) Fill the fuel tanks and inspect for leaks - refer to 12-11-01 301, 28-10-00 601. 000 X
NOTE : Before and during refueling, perform operational tests of
fuel gages - refer to
28-40-01 401 and low fuel level
detectors (if installed) - refer to
28-40-04 201.
12-20 Scheduled servicing
12-20 1) Clean exterior surface. Inspect for corrosion 000 X X X
- refer to 12-20-03 201.
12-20 2) Clean the engine - refer to 12-20-03 201. 000 X X X
20-00 AIRFRAME STANDARD PRACTICES
20-00 General
20-00 1) Reinforce the anticorrosion protection -
refer to 20-00-04 201 and lubricate - refer to 12-21-02 201. 200 X X X X
20-00 2) Reinforce the anticorrosion protection -
refer to 20-00-04 201 and lubricate - refer to 12-21-05 201. 700 X X X
20-00 3) Reinforce the anticorrosion protection -
refer to 20-00-04 201 and lubricate - refer to 12-21-04 201. 500 X X X
20-00 4) Reinforce the anticorrosion protection -
refer to 20-00-04 201 and lubricate - refer to 12-21-04 201. 600 X X X
20-00 5) Reinforce the anticorrosion protection -
refer to 20-00-04 201 and lubricate - refer to 12-21-01 201. 100 X X X X
20-00 6) Reinforce the anticorrosion protection -
refer to 20-00-04 201 and lubricate - refer to 12-21-03 201. 300 X X X
21-00 AIR CONDITIONING
21-20 Distribution
21-20 1) Perform an operational test of NACA inlet and air outlet blanking flaps. 200 X X
NOTE 1 : If a 100-hr. inspection has been carried out during the last 3 months, do not perform the operations identified with a "0" unless the annual inspection replaces a 100-hr. inspection. For US registered aircraft, perform all operations.