• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-13 19:36来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

NOTE : Add annual inspections and engine inspections (the latter are to be programmed on the same basis than airframe inspections).
In an economic interest, the coincidence of the airframe scheduled inspections with the engine scheduled inspections and the annual inspections falls to the aircraft's owner.
Inspection calendar (partial)
Figure 1
WA
Validity : S / N 1 - 9999 jPua e 31
05-20-00 (BA) Ngo
 
PAGE INTENTIONALLY LEFT BLANK
AAAA
Validity : S / N 1 - 9999 05-20-00Page 4
(BA) JUN 01
 
SUMMARY OF INSPECTIONS (per ATA)
ATA OPERATIONS Area INSPECTIONS
   1st
25 hrs 50
hrs 100
hrs Major Ann. Other
 PRELIMINARY STEPS 000     Ix x x x x x x x x x x x 
 1) Record anomalies into log book or
equivalent document for corrective action. 000      
 2) Check aircraft compliance with
airworthiness directives, service bulletins
and service letters - refer to 05-00-02 1. 000      
 3) Check expiry dates of life-limited parts : 000      
 - airframe - refer to 04-00-00 1 and       
 05-50-05 601,
- equipment and hoses - refer to       
 05-10-001.       
 4) Perform a test run-up. Record parameters 000      
 (at engine start) - refer to 05-30-02 201.       
71-10 5) Remove upper engine cowling 121 and lower engine cowling 131. Visually inspect for cracks, wear, evidence of leaks (oil, fuel, air, exhaust gas) and security - refer
to 71-10-01 201. 100      
52-40 6) Remove battery access door 243 (battery at the rear), visually inspect for cracks and security. 200 x x X X  
52-40 7) Remove battery access door 211 R (front battery option), visually inspect for cracks and security. 200      
24-30 8) Disconnect battery - refer to 24-30-02 201. 000      
52-40 9) Remove inspection doors 211L, 211R (if installed), visually inspect for cracks and security. 200      
52-40 10) Remove firewall- mounted inspection doors 200      
 212L (partial removal) and 212R (if
installed), visually inspect for cracks and security.       
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飞机维护手册 05 时间限制维护检查 1(55)