• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-31 23:48来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 R = REVISED, A = ADDED OR D = DELETED CHAPTER 05 F = FOLDOUT PAGE EFFECTIVE PAGES 17 PAGE 2 JUL 12/02 LAST PAGE

D6-37537
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS

 TABLE OF CONTENTS
_________________
 Subject
_______
UNSCHEDULED MAINTENANCE CHECKS
______________________________ CONDITIONAL INSPECTIONS Maintenance Practices General ACID SPILLAGE (CONDITIONAL INSPECTION) Maintenance Practices AIRFRAME VIBRATION CONDITION Maintenance Practices BATTERY ELECTROLYTE CONTAMINATION CONDITION
 Maintenance Practices
BIRD/HAIL STRIKE CONDITION
Maintenance Practices

BRAKE SEIZURE CONDITION Maintenance Practices CABIN DEPRESSURIZATION CONDITION Maintenance Practices CABIN OVERPRESSURIZATION CONDITION Maintenance Practices CONDITIONED AIR PACK OUTLET DUCT SYSTEM FAILURE Maintenance Practices
DRAGGED ENGINE NACELLE/ENGINE SEIZURE/THRUST REVERSER AND ATTACH POINTS DAMAGE
 Maintenance Practices
EXCEEDING DESIGN SPEED, STALL, SEVERE TURBULENCE OR BUFFETING CONDITION
 Maintenance Practices EXCEEDING FLAP DOWN SPEEDS CONDITION Maintenance Practices EXCEEDING MAX NLG TOWING ANGLE OR MAX TOWING LOAD Maintenance Practices EXCESSIVE AILERON OR RUDDER TRIM CORRECTION WITH FLAPS EXTENDED Maintenance Practices
Chapter SectionSubject_______ Page____ Effectivity
05-50-00
05-51-00201 ALL
20105-51-58
201 ALL05-51-67
201 ALL05-51-15
201 ALL05-51-37
201 ALL05-51-04
201 ALL05-51-81
201 ALL05-51-24
201 ALL05-51-80
201 ALL05-51-61
201 ALL05-51-31
201 ALL05-51-41
201 ALL05-51-29
201 ALL05-51-75
201 ALL
 5-CONTENTS

 ú
 ú  BEJ.101  Page 1
 ú  Jul 12/02 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS

 TABLE OF CONTENTS
_________________
 Chapter
 Section Subject_______ Subject ____ Effectivity
_______ Page ___________
 EXCESSIVE CABIN PRESSURE LEAKAGE 05-51-91
 Maintenance Practices 201 ALL
 EXTREME DUST CONDITION 05-51-21
 Maintenance Practices 201 ALL
 FLAT SPOTTED TIRES 05-51-55
 Maintenance Practices 201 ALL
 GALLEY SPILL CONDITION 05-51-13
 Maintenance Practices 201 ALL
 HARD LANDING OR HIGH DRAG/SIDE 05-51-51
 LOAD LANDING
 Maintenance Practices 201 ALL
 Phase I Inspection 202
 Phase II Inspection 211
 HIGH ENERGY STOP/HEAT DAMAGE 05-51-07
 Maintenance Practices 201 ALL
 Heat Damage Inspection 207
 High Energy Stop 201
 HOT AIR DUCT RUPTURE CONDITION 05-51-34
 Maintenance Practices 201 ALL
 HYDRAULIC FLUID REACTION WITH 05-51-17
 TITANIUM
 Maintenance Practices 201 ALL
 ICE OR SNOW CONDITION 05-51-11
 Maintenance Practices 201 ALL
 LANDING GEAR DOWN OVERSPEED 05-51-47
 CONDITION
 Maintenance Practices 201 ALL
 LIGHTNING STRIKE CONDITION 05-51-27
 Maintenance Practices 201 ALL
 MERCURY SPILLAGE CONDITION 05-51-14
 Maintenance Practices 201 ALL
 NACELLE/STRUT PRESSURE RELIEF 05-51-44
 DOORS OPEN CONDITION
 Maintenance Practices 201 ALL
 OVERWEIGHT LANDING 05-51-74
 Maintenance Practices 201 ALL
 Phase I Examination 201
 Phase II Examination 203
 OVERWEIGHT TAXI CONDITION 05-51-09
 Maintenance Practices 201 ALL
 SEPARATION - APU TURBINE WHEEL 05-51-40
 Maintenance Practices 201 ALL
 5-CONTENTS

 ú
 ú  BEJ.101  Page 2
 ú  Jul 12/02 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS TABLE OF CONTENTS
_________________
 Subject
_______
TAIL DRAG CONDITION Maintenance Practices TIRE TREAD LOSS OR TIRE BURST Maintenance Practices TOILET OVER-SERVICING CONDITION Maintenance Practices VOLCANIC ASH CONDITION Maintenance Practices WHEEL BEARING FAILURE/DAMAGE CONDITION Maintenance Practices Wheel Bearing Failure
Chapter SectionSubject
05-51-6405-51-5405-51-1205-51-5705-51-08
Page____  Effectivity___________
201  ALL
201  ALL
201  ALL
201  ALL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 TIME LIMITS/MAINTENANCE CHE(2)