D6-37537
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS
TABLE OF CONTENTS
_________________
Subject
_______
UNSCHEDULED MAINTENANCE CHECKS
______________________________ CONDITIONAL INSPECTIONS Maintenance Practices General ACID SPILLAGE (CONDITIONAL INSPECTION) Maintenance Practices AIRFRAME VIBRATION CONDITION Maintenance Practices BATTERY ELECTROLYTE CONTAMINATION CONDITION
Maintenance Practices
BIRD/HAIL STRIKE CONDITION
Maintenance Practices
BRAKE SEIZURE CONDITION Maintenance Practices CABIN DEPRESSURIZATION CONDITION Maintenance Practices CABIN OVERPRESSURIZATION CONDITION Maintenance Practices CONDITIONED AIR PACK OUTLET DUCT SYSTEM FAILURE Maintenance Practices
DRAGGED ENGINE NACELLE/ENGINE SEIZURE/THRUST REVERSER AND ATTACH POINTS DAMAGE
Maintenance Practices
EXCEEDING DESIGN SPEED, STALL, SEVERE TURBULENCE OR BUFFETING CONDITION
Maintenance Practices EXCEEDING FLAP DOWN SPEEDS CONDITION Maintenance Practices EXCEEDING MAX NLG TOWING ANGLE OR MAX TOWING LOAD Maintenance Practices EXCESSIVE AILERON OR RUDDER TRIM CORRECTION WITH FLAPS EXTENDED Maintenance Practices
Chapter SectionSubject_______ Page____ Effectivity
05-50-00
05-51-00201 ALL
20105-51-58
201 ALL05-51-67
201 ALL05-51-15
201 ALL05-51-37
201 ALL05-51-04
201 ALL05-51-81
201 ALL05-51-24
201 ALL05-51-80
201 ALL05-51-61
201 ALL05-51-31
201 ALL05-51-41
201 ALL05-51-29
201 ALL05-51-75
201 ALL
5-CONTENTS
ú
ú BEJ.101 Page 1
ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS
TABLE OF CONTENTS
_________________
Chapter
Section Subject_______ Subject ____ Effectivity
_______ Page ___________
EXCESSIVE CABIN PRESSURE LEAKAGE 05-51-91
Maintenance Practices 201 ALL
EXTREME DUST CONDITION 05-51-21
Maintenance Practices 201 ALL
FLAT SPOTTED TIRES 05-51-55
Maintenance Practices 201 ALL
GALLEY SPILL CONDITION 05-51-13
Maintenance Practices 201 ALL
HARD LANDING OR HIGH DRAG/SIDE 05-51-51
LOAD LANDING
Maintenance Practices 201 ALL
Phase I Inspection 202
Phase II Inspection 211
HIGH ENERGY STOP/HEAT DAMAGE 05-51-07
Maintenance Practices 201 ALL
Heat Damage Inspection 207
High Energy Stop 201
HOT AIR DUCT RUPTURE CONDITION 05-51-34
Maintenance Practices 201 ALL
HYDRAULIC FLUID REACTION WITH 05-51-17
TITANIUM
Maintenance Practices 201 ALL
ICE OR SNOW CONDITION 05-51-11
Maintenance Practices 201 ALL
LANDING GEAR DOWN OVERSPEED 05-51-47
CONDITION
Maintenance Practices 201 ALL
LIGHTNING STRIKE CONDITION 05-51-27
Maintenance Practices 201 ALL
MERCURY SPILLAGE CONDITION 05-51-14
Maintenance Practices 201 ALL
NACELLE/STRUT PRESSURE RELIEF 05-51-44
DOORS OPEN CONDITION
Maintenance Practices 201 ALL
OVERWEIGHT LANDING 05-51-74
Maintenance Practices 201 ALL
Phase I Examination 201
Phase II Examination 203
OVERWEIGHT TAXI CONDITION 05-51-09
Maintenance Practices 201 ALL
SEPARATION - APU TURBINE WHEEL 05-51-40
Maintenance Practices 201 ALL
5-CONTENTS
ú
ú BEJ.101 Page 2
ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS TABLE OF CONTENTS
_________________
Subject
_______
TAIL DRAG CONDITION Maintenance Practices TIRE TREAD LOSS OR TIRE BURST Maintenance Practices TOILET OVER-SERVICING CONDITION Maintenance Practices VOLCANIC ASH CONDITION Maintenance Practices WHEEL BEARING FAILURE/DAMAGE CONDITION Maintenance Practices Wheel Bearing Failure
Chapter SectionSubject
05-51-6405-51-5405-51-1205-51-5705-51-08
Page____ Effectivity___________
201 ALL
201 ALL
201 ALL
201 ALL
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 TIME LIMITS/MAINTENANCE CHE(2)