• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-28 09:13来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 - PRESS CONTROLLER 2 (37) or,

 - PRESS CONTROLLER 2 (38) or,

 - PRESS CONTROLLER 2 (39) or,

 - PRESS CONTROLLER 2 (40) or,

 - PRESS CONTROLLER 2 (41) or,

 - PRESS CONTROLLER 2 (45) or,

 - PRESS CONTROLLER 2 (46) or,

 - PRESS CONTROLLER 2 (47) or,

 - PRESS CONTROLLER 2 (49) or,

 - PRESS CONTROLLER 2 (53) or,


 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞21-31-00∞∞∞∞∞∞∞∞∞∞Page 214
 Aug 01/03R CES


 - PRESS CONTROLLER 2 (58) or,

 - PRESS CONTROLLER 2 (61),

 - replace the CONTROLLER-CABIN PRESSURE 2 (12HL) (Ref. AMM TASK 21-31-34-000-001) and (Ref. AMM TASK 21-31-34-400-001).


 B. Do the test as given in the Para. 3.A.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞21-31-00∞∞∞∞∞∞∞∞∞∞Page 215
 Aug 01/03R
 CES

 TASK 21-31-00-810-807


 Outflow Valve Fault (05), (11), (24), (25), (26), (29), (60)
 1. Possible Causes
_______________
 - VALVE-OUTFLOW (10HL)

 - VALVE-OUTFLOW (10HL), AUTO MOTOR 1

 - VALVE-OUTFLOW (10HL), FEEDBACK ASSEMBLY


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 21-31-00-710-002 Operational Test of the Pressure Control and
 Monitoring AMM 21-31-51-000-001 Removal of the Outflow Valve 10HL (From Inside) AMM 21-31-51-000-003 Removal of the Outflow Valve (10HL) - Auto Motor
 10HL-3 (10HL-4)
 AMM 21-31-51-000-005 Removal of the Outflow Valve (10HL) - Feedback

 Assembly 10HL-6 AMM 21-31-51-000-006 Removal of the Outflow Valve 10HL (From Outside) AMM 21-31-51-400-001 Installation of the Outflow Valve 10HL (From Inside) AMM 21-31-51-400-003 Installation of the Outflow Valve (10HL) - Auto Motor
 10HL-3 (10HL-4) AMM 21-31-51-400-005 Installation of the Outflow Valve (10HL) - Feedback Assembly 10HL-6 AMM 21-31-51-400-006 Installation of the Outflow Valve 10HL (From Outside)
 3. Fault Confirmation
__________________
 A. Test
 (1) Do the operational test of the pressure control and monitoring system (Ref. AMM TASK 21-31-00-710-002).
 4. Fault Isolation
_______________
 A. If one of the reports, LAST LEG REPORT, PREVIOUS LEG REPORT, CLASS 3 FAULTS and/or the test gives one of the maintenance messages which follow,
 - OUTFLOW VALVE (05),

 - OUTFLOW VALVE (11),

 - OUTFLOW VALVE (24),

 - OUTFLOW VALVE BLOCKED (29) or,

 - OUTFLOW VALVE (60):

 - replace the VALVE-OUTFLOW (10HL), AUTO MOTOR 1 (Ref. AMM TASK 21-31-51-000-003) and (Ref. AMM TASK 21-31-51-400-003).


 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞21-31-00∞∞∞∞∞∞∞∞∞∞Page 216
 Aug 01/03R CES


 (1) If the fault continues:
 - replace the VALVE-OUTFLOW (10HL) (Ref. AMM TASK 21-31-51-000-001) and (Ref. AMM TASK 21-31-51-400-001) or (Ref. AMM TASK 21-31-51-000-006) and (Ref. AMM TASK 21-31-51-400-006).
 B. Test Result
 NOTE : This procedure is only applicable for Outflow Valve Part Numbers
____
 9023-15703 and previous.

 (1) If the test gives the maintenance message,
 OUTFLOW VALVE (25), or
 OUTFLOW VALVE (26):

 - replace the VALVE-OUTFLOW (10HL), FEEDBACK ASSEMBLY (Ref. AMM TASK 21-31-51-000-005) and (Ref. AMM TASK 21-31-51-400-005).
 C. Test Result
 NOTE : This procedure is only applicable for Outflow Valve Part Number
____
 20790-01AA and onwards.

 (1) If the test gives the maintenance message,
 OUTFLOW VALVE (25), or
 OUTFLOW VALVE (26):

 - replace the VALVE-OUTFLOW (10HL) (Ref. AMM TASK 21-31-51-000-001) and (Ref. AMM TASK 21-31-51-400-001).
 D. Do the test as given in the Para. 3.A.
 5. Close-up
________
 A. Put the aircraft back to its initial configuration.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞21-31-00∞∞∞∞∞∞∞∞∞∞Page 217
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 AIR CONDITIONING 空调1(95)