ú
 31-31-03
 ALL  ú ú 08.1 Page 211 ú Sep 28/02
A
757 
MAINTENANCE MANUAL
 (2)  AMM 24-22-00/201, Electrical Power Control
 C. Access
 (1)  Access Panel
 119BL Main Equipment Center, E3-3
 D. Procedure
 S 862-017
 (1)  
Do this task: Supply Electrical Power (AMM 24-22-00/201).
S 012-018
 (2)  
Open the PCMCIA door on the front of the FDAU.
S 202-019
 (3)  
Make sure the PCMCIA slots are empty.
S 412-020
 (4) 
Install the load card into the left slot of the PCMCIA interface.
 (a)  Make sure the IN PROG LED light is ON.
 NOTE: Do not remove the load card from the FDAU while the IN
____ PROG LED is ON. This will cause the FDAU to abort the upload. The upload takes approximately 5 minutes.
 (b)  Make sure the XFER COMP LED light comes on when the load is complete.
 S 022-021
 (5)  
Push the eject button.
S 022-022
 (6)  
Remove the load card from the PCMCIA interface.
S 472-023
 (7)  
Move and release the ACMS/DFDAU switch to the applicable position:
 (a)  
DFDAU position to display mandatory software configuration number.
 (b)  
ACMS position to display non-mandatory software configuration number.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 仪表 CHAPTER 31 - INSTRUMENTS 1(119)