AMM 52-22-00-614-002 Charging of the Door Damper and Emergency Operation Cylinders (1600WM, 1601WM, 1602WM, 1603WM) at the Emergency Exit Doors
AMM 52-22-00-860-003 Special Precaution before Maintenance on the Door Damper and Emergency Operation Cylinder AMM 52-22-00-860-004 Special Precaution after Maintenance on the Door Damper and Emergency Operation Cylinder AMM 52-22-00-860-005 Replacement of the Charging Valve and Percussion Mechanism Seals AMM 52-22-14-000-001 Removal of the Door Damper and Emergency Operation Cylinder AMM 52-22-14-400-001 Installation of the Door Damper and Emergency Operation Cylinder
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-22-00-991-001 Fig. 201
3. Fault Confirmation
__________________
A. Job Set-up
(1) Make sure that the access platform is in position below the applicable emergency exit door.
(2) Partly open the applicable emergency exit door as required (Ref. AMM TASK 52-22-00-010-001).
(3) Do the special precautions befor maintenance on the door damper and emergency operation cylinder (referred to as door damper) (Ref. AMM TASK 52-22-00-860-003).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU COM/CIDS/DEU B/ESS 153RH G03
C. Leak Test of the Door Damper
(Ref. Fig. 201/TASK 52-22-00-991-001)
(1) Charge the pressure accumulator of the door damper with the correct pressure (Ref. AMM TASK 52-22-00-614-002).
(2) Apply a solution of OXYGEN LEAK DETECTION or a Soapy Water to the subsequent components to find an air leak:
- between the striker housing and the housing assy (leak point 1) - on the charging valve (leak point 2)
- between the pressure gauge and the bottle assembly (leak point 3) - on the vent hole of the bottle assembly (leak point 5)
- between the charging valve and the bottle assembly (leak point 6)
4. Fault Isolation
_______________
WARNING : BEFORE YOU START WORK ON THE DOOR MAKE SURE THAT: - THE SLIDE
_______ CONTROL HANDLE IS IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED. - THE PERCUSSION LEVER OF THE DOOR DAMPER CYLINDER IS IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 301-399, ∞∞52-22-00∞∞∞∞∞∞∞∞∞∞Page 240
May 01/05R
CES
Leak Check Points on the Door Damper and Emergency Operation Cylinder
Figure 201/TASK 52-22-00-991-001
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 301-399, ∞∞52-22-00∞∞∞∞∞∞∞∞∞∞Page 241
May 01/04 CES A. If you find a sign of nitrogen leaks (bubbles) continues as folows:
(1) If you find a leak on leak point 3:
- to 3.0 m.daN (22.12 lbf.ft) the pressure filling valve.
(a) If there still bubbles again:
- replace the seal of the pressure filling valve (Ref. AMM TASK 52-22-00-860-005) and repeat the leak test.
(2) If you find a leak on leak point 2:
- to 1.0 m.daN (88.49 lbf.in) the charching valve nut.
(a) If there still bubbles:
- replace the pressure filling valve (Ref. AMM TASK 52-22-00-860-005) and repeat the leak test.
(3) If you find a leak on leak point 4:
- replace the door damper (Ref. AMM TASK 52-22-14-000-001) and (Ref. AMM TASK 52-22-14-400-001). 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 舱门 DOORS(90)