TASK 52-11-00-810-816
Visual Indicator of the Locking Mechanism of the R FWD Passenger/Crew Door Inoperative
1. Possible Causes
_______________
- locking mechanism
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 52-10-00-720-004 Functional Test of the Visual Indicator of the Door
Locking Mechanism AMM 52-11-11-000-001 Removal of the FWD Passenger/Crew Door AMM 52-11-11-400-001 Installation of the FWD Passenger/Crew Door AMM 52-11-21-820-001 Adjustment/Test of the Door Locking Mechanism of the
FWD Passenger/Crew Door
3. Fault Confirmation
__________________
A. Test
(1) Do the functional test of the visual indicator of the door locking mechanism (Ref. AMM TASK 52-10-00-720-004).
4. Fault Isolation
_______________
A. If the test confirms the fault:
- adjust the locking mechanism (Ref. AMM TASK 52-11-21-820-001).
(1) If the fault continues:
- replace the R FWD passenger/crew door (Ref. AMM TASK 52-11-11-000-001) and (Ref. AMM TASK 52-11-11-400-001)
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞52-11-00∞∞∞∞∞∞∞∞∞∞Page 244
Nov 01/03R
CES
TASK 52-11-00-810-817
Incorrect Distribution of the Pressure Loads on the Frame for the L FWD Passenger/Crew Door
1. Possible Causes
_______________
- door stop fittings
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 52-10-00-200-001 Check of the Door Stop Adjustment of the
Passenger/Crew Door AMM 52-11-00-820-001 Adjustment of the FWD Passenger/Crew Door AMM 52-11-31-000-002 Removal of the Stop Fittings, Buffer, Guide Fittings,
Rollers, Door Stop Fittings, Roller Fittings and Guide Arm Fittings
AMM 52-11-31-400-002 Installation of the Stop Fittings, the Buffer, the Guide Fittings, the Rollers, the Door Stop Fittings, the Roller Fittings and the Guide Arm Fittings
3. Fault Confirmation
__________________
A. Test Do a check of the door stop adjustment of the passenger/crew door (Ref. AMM TASK 52-10-00-200-001).
4. Fault Isolation
_______________
A. If the test confirms the fault:
- adjust the door stop fittings (Ref. AMM TASK 52-11-00-820-001).
(1) If the fault continues:
- replace the door stop fittings (Ref. AMM TASK 52-11-31-000-002) and (Ref. AMM TASK 52-11-31-400-002).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞52-11-00∞∞∞∞∞∞∞∞∞∞Page 245
Nov 01/03R
CES
TASK 52-11-00-810-818
Incorrect Distribution of the Pressure Loads on the Frame for the R FWD Passenger/Crew Door
1. Possible Causes
_______________
- door stop fittings
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 52-10-00-200-001 Check of the Door Stop Adjustment of the
Passenger/Crew Door AMM 52-11-00-820-001 Adjustment of the FWD Passenger/Crew Door AMM 52-11-31-000-002 Removal of the Stop Fittings, Buffer, Guide Fittings,
Rollers, Door Stop Fittings, Roller Fittings and Guide Arm Fittings
AMM 52-11-31-400-002 Installation of the Stop Fittings, the Buffer, the Guide Fittings, the Rollers, the Door Stop Fittings, the Roller Fittings and the Guide Arm Fittings
3. Fault Confirmation
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 舱门 DOORS(39)