(5) Shut down the engines (Ref. AMM TASK 71-00-00-710-028).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : ALL ∞∞29-23-00∞∞∞∞∞∞∞∞∞∞Page 218
May 01/04 CES
4. Fault Isolation
_______________
**ON A/C 001-049, 051-058, 101-101,
A. If after start of the engine No. 1:
- the PTU starts continuous running and stops after you have switched off and on the YELLOW/ENG 2 PUMP P/BSW:
- replace the SOL VALVE-PTU, G (1012GL) (Ref. AMM TASK 29-23-51-000-001) and (Ref. AMM TASK 29-23-51-400-001).
(1) If the fault continues:
- do the troubleshooting of the continuous running of the PTU (Ref. TASK 29-23-00-810-802).
R **ON A/C 059-099, 102-149, 151-199, 201-299, 301-399, 401-499,
A. If after start of the engine No. 1:
- the PTU starts continuous running and stops after you have switched off and on the YELLOW/ENG 2 PUMP P/BSW:
- replace the MANIFOLD,PTU (1113GM) (Ref. AMM TASK 29-11-15-000-001) and (Ref. AMM TASK 29-11-15-400-001).
(1) If the fault continues:
- do the troubleshooting of the continuous running of the PTU (Ref. TASK 29-23-00-810-802).
**ON A/C ALL
B. Do the fault confirmation procedure as given in Para. 3. to make sure that operation is correct.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-23-00∞∞∞∞∞∞∞∞∞∞Page 219
Aug 01/05 CES
TASK 29-23-00-810-807
Continuous Running of the PTU during Operation of the Cargo-Compartment Doors
1. Possible Causes
_______________
- SOL VALVE-PTU, Y (3012GL)
- wiring
- RELAY CTL (3811GX)
- MANIFOLD, PTU (3015GM)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 29-13-15-000-001 Removal of the Power Transfer Unit (PTU) Manifold of the Yellow Hydraulic System AMM 29-13-15-400-001 Installation of the Power Transfer Unit (PTU) Manifold of the Yellow Hydraulic System AMM 29-23-51-000-002 Removal of the Solenoid Valve 3012GL of the Power Transfer Unit AMM 29-23-51-400-002 Installation of the Solenoid Valve 3012GL of the Power Transfer Unit AMM 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump AMM 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump ASM 29-23/01
3. Fault Confirmation
__________________
A. Do this test:
(1) Make sure that:
- the SW PARK BRK CTL (73GG) is set to OFF,
- the Nose L/G is compressed,
- no towing arm is installed.
(2) Operate the FWD or AFT cargo-compartment door with the Yellow electric pump (Ref. AMM TASK 52-30-00-860-001) and (Ref. AMM TASK 52-30-00-860-002).
(3) Do a check of the PTU for continuous running during the operation of the cargo-compartment door.
(4) Make sure that the the cargo-compartment door is fully opened or closed.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-23-00∞∞∞∞∞∞∞∞∞∞Page 220
May 01/04R CES
4. Fault Isolation
_______________
**ON A/C 001-049, 051-058, 101-101,
A. If the PTU runs during the operation of the cargo-compartment door:
NOTE : Make sure that a second person operates one cargo-compartment door
____ during all checks for 28 VDC in the subsequent procedure.
- do a check for 28 VDC between: the SOL VALVE-PTU, Y (3012GL) connector A/A and the connector A/B (Ref. ASM 29-23/01).
(1) If there is 28 VDC:
- replace the SOL VALVE-PTU, Y (3012GL) (Ref. AMM TASK 29-23-51-000-002) and (Ref. AMM TASK 29-23-51-400-002).
(2) If there is no 28 VDC:
- do a check for 28 VDC at the:
- RELAY CTL (3811GX) connector B1 (Ref. ASM 29-23/01).
(a) If there is 28 VDC:
- do a check and repair the wiring between the RELAY CTL (3811GX) connector B1 and the SOL VALVE-PTU, Y (3012GL) connector A/B (Ref. ASM 29-23/01). 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 液压(92)