• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-28 18:26来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 - repair the wiring as necessary.
 B. Do the test as given in Para. 3. A. to make sure that operation is correct.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-11-00∞∞∞∞∞∞∞∞∞∞Page 220
 Aug 01/04R
 CES


 TASK 29-11-00-810-805

 

 Loss of the System Pressure of the Green Hydraulic System
 1. Possible Causes_______________
R  - PRESS SW-FLT CTL, G (1151GN) - SOL VALVE-LEAKAGE MEAS, G (1150GP) - MANIFOLD,HP (1111GM) - pushbutton switch 1882GP - wiring
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
AMM  24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 AMM  24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied from the External Power
R R R  AMM AMM AMM AMM  29-10-00-863-001 29-10-00-864-001 29-11-14-000-001 29-11-14-400-001  Pressurize the Green Hydraulic SystemDepressurize the Green Hydraulic System Removal of the HP Manifold of the Green Hydraulic System Installation of the HP Manifold of the Green 
R  AMM AMM AMM AMM AMM AMM AMM AMM ASM ASM ASM  29-19-51-000-001 29-19-51-400-001 29-23-00-860-001 29-23-00-860-002 29-23-00-863-001 29-23-00-864-001 29-32-12-000-001 29-32-12-400-001 29-19/0129-32/0131-52/02 Hydraulic SystemRemoval of the Leakage-Measurement Solenoid Valve (1150GP)Installation of the Leakage-Measurement Solenoid Valve (1150GP)Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Connection of the Isolation Coupling of the Power Transfer Unit (PTU)Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric PumpDepressurize the Green and Yellow Hydraulic Systems after Operation of the PTURemoval of the System Pressure Switch (1151GN)Installation of the System Pressure Switch (1151GN)

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-11-00∞∞∞∞∞∞∞∞∞∞Page 221
 Nov 01/04 CES


 3. Fault Confirmation
__________________


 A. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST 1881GP N35 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 B. Aircraft Maintenance Configuration
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
_______ ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 (1) Disconnect the isolation coupling of the PTU (Ref. AMM TASK 29-23-00-860-001).

 (2) Energize the aircraft electrical circuits
 (Ref. AMM TASK 24-41-00-861-002).


 (3) On panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch is set to on (OFF light not on).

 (4) Pressurize the Green hydraulic system from a ground supply or through the PTU (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).

 (5) Look for fault indications on the lower ECAM DU.


 4. Fault Isolation
_______________

R **ON A/C 001-049, 051-058, 101-101,
 A. If the fault confirmation gives:
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______ CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE.
 - the system name and the flow arrow of the Green hydraulic system in amber on the lower ECAM DU:

 - do a check of the system pressure on the lower ECAM DU and on the system accumulator gage (1072GM).


 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-11-00∞∞∞∞∞∞∞∞∞∞Page 222
 May 01/05 CES

 

 (1) If the system pressure is more than 1450 psi:
 - use the rudder pedals to operate the rudder.
 (a) If the rudder operates:
 - do a check for continuity between the: the PRESS SW-FLT CTL, G (1151GN) connector A/A and the connector A/C (with the hydraulic system pressurized) (Ref. ASM 29-32/01).
 1_ If there is continuity:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 液压(24)