(1) If the three hydraulic fluid quantity indicators show the same quantity, the pressure of the reservoir is correct, but the accumulator pressure is less than the permitted tolerance:
(a) Do a check for external gas leaks on the power accumulator and repair the defective components as necessary (Ref. AMM TASK 29-10-00-200-003).
(b) If you find no external gas leaks, or the fault continues:
1_ Replace the ACCU-Y PWR (3070GM) (Ref. AMM TASK 29-13-42-000-
001) and (Ref. AMM TASK 29-13-42-400-001).
2_ Do the bleeding procedures of the Yellow hydraulic system
(Ref. AMM TASK 29-00-00-870-004), (Ref. AMM TASK 29-00-00-870-
005), (Ref. AMM TASK 29-00-00-870-006) and (Ref. AMM TASK 29-
00-00-870-007).
B. Do the procedure as given in Para. 3. B. to make sure that the operation of the hydraulic quantity indication is correct.
5. Close-up
________
A. Put the aircraft back to the serviceable condition.
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-13-00∞∞∞∞∞∞∞∞∞∞Page 246
Aug 01/01R
CES
TASK 29-13-00-810-816
Fault of the System Pressure Indication of the Yellow Hydraulic System
1. Possible Causes
_______________
- TIME RELAY (3816GX)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 22-91-00-710-001 Ground Scanning of the AFS AMM 29-13-00-710-002 Operational Test of the Yellow Hydraulic System
3. Fault Confirmation
__________________
A. Do the operational test of the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002).
4. Fault Isolation
_______________
A. If the test gives:
- the message HYD Y SYS LO PR on the upper ECAM DU,
- a system pressure indication of 3000 psi on the lower ECAM DU,
- an intermittent PTU indication in amber on the lower ECAM DU:
(1) Do the ground scanning of the AFS (Ref. AMM TASK 22-91-00-710-001).
(a) If the ground scanning shows the messages:
- AFS: HYD 3151GN
- AFS: ELAC
- SFCC 2: WRONG INHIBIT SIGN FROM CARGO DOOR YELLOW SYSTEM
- replace the TIME RELAY (3816GX).
B. Do the fault confirmation procedure as given in Para. 3. to make sure that the operation is correct.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞29-13-00∞∞∞∞∞∞∞∞∞∞Page 247
Aug 01/01 CES
R TASK 29-13-00-810-817
R Hydraulic System Pressure higher than normal
R 1. Possible Causes
_______________
R - FILTER-ENG 2 PUMP CASE DRAIN, Y (3084GM)
R - PUMP-Y, ENG 2 (3030GD)
R - PRESS XDCR-Y (3065GN)
R - FILTER-HP, Y (3048GM)
R - SDAC-1 (1WV1)
R - SDAC-2 (1WV2)
R 2. Job Set-up Information
______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------
R No specific 1 GROUND POWER UNIT - HYDRAULIC
R B. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R AMM 12-12-29-611-001 R AMM 24-41-00-861-002 R R AMM 24-41-00-862-002 R R AMM 29-10-00-863-002 R AMM 29-10-00-864-002 R AMM 29-13-43-610-041 R R AMM 29-13-45-610-001 R AMM 29-13-51-000-004 R AMM 29-13-51-400-004 R AMM 29-14-00-614-002 R R AMM 29-32-11-000-003 R R AMM 29-32-11-400-003 R R AMM 31-55-34-000-001 R AMM 31-55-34-400-001 R AMM 31-60-00-860-001 R AMM 31-60-00-860-002 R AMM 71-00-00-710-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Pressurize the Yellow Hydraulic System Depressurize the Yellow Hydraulic System Servicing of the Engine Pump Case-Drain Filter (3084GM) Servicing of the HP-Filter (3048GM) Removal of the Yellow Engine Pump (3030GD) Installation of the Yellow Engine Pump (3030GD) Pressurization of the Hydraulic Reservoirs through the Ground Connector Removal of the Hydraulic Pressure Transmitter (3065GN) Installation of the Hydraulic Pressure Transmitter (3065GN) Removal of the SDAC (1WV1,1WV2) Installation of the SDAC (1WV1,1WV2) EIS Start Procedure EIS Stop Procedure Dry Motoring Check