• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:09来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 121VU ADIRS/ADIRU/3PWR/SWTG 9FP N10
 1EFF : ALL 1 34-11-19Page 401 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R  **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU ADIRS/ADIRU/3PWR/SWTG  9FP  N09
 **ON A/C ALL
 122VU ANTI ICE/PROBES/1/STATIC 122VU ANTI ICE/PROBES/1/TAT FOR 3FP2 5DA1 1DA1  Z13Z12
 **ON A/C 001-049, 051-061, 101-105, 201-203,
 121VU ADIRS/ADIRU/2PWR/SHED 121VU ADIRS/ADIRU/2/26VAC AND AOA 121VU ADIRS/ADIRU/2/115VAC  10FP 5FP2 4FP2  N11N09N07 
R  **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU ADIRS/ADIRU/2PWR/SHED 121VU ADIRS/ADIRU/2/26VAC AND AOA 121VU ADIRS/ADIRU/2/115VAC  10FP 5FP2 4FP2  N10N08N06
 **ON A/C ALL
 122VU ANTI ICE/PROBES/2/TAT 122VU ANTI ICE/PROBES/2/PITOT 122VU ANTI ICE/PROBES/2/AOA 122VU ANTI ICE/PROBES/2/PHC 122VU ANTI ICE/PROBES/2/STATIC FOR 3FP3 1DA2 3DA2 4DA2 2DA2 5DA2  Y15Y14Y13Y12Y11
 **ON A/C 001-049, 051-061, 101-105, 201-203,
 121VU ADIRS/ADIRU/3PWR/SWTG 121VU ADIRS/ADIRU/3/26VAC AND AOA 121VU ADIRS/ADIRU/3/115VAC  9FP 5FP3 4FP3  N10N08N06

 1EFF : ALL 1 34-11-19Page 402 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU ADIRS/ADIRU/3PWR/SWTG 9FP N09 121VU ADIRS/ADIRU/3/26VAC AND AOA 5FP3 N07 121VU ADIRS/ADIRU/3/115VAC 4FP3 N05
 **ON A/C ALL
 122VU ANTI ICE/PROBES/PHC/3 2DA3 Y16 122VU ANTI ICE/PROBES/3/PITOT 3DA3 Z16 122VU ANTI ICE/PROBES/3/AOA 4DA3 Z15 122VU ANTI ICE/PROBES/3/STATIC 5DA3 Z14
 Subtask 34-11-19-860-050
 B. Put an access platform in position in zone 231 for 3FP1 (232 for 3FP2) (127 for 3FP3).
 4. Procedure
_________ R Subtask 34-11-19-020-050
 A. Removal of the Angle of Attack Sensor (3FP1, 3FP2, 3FP3) NOTE : The procedure is the same for angle of attack sensors 3FP1, 3FP2
____
 and 3FP3.

 (1)
 Remove the potting compound from the screw (6).

 (2)
 Loosen the seven screws (8).

 (3)
 Remove the blanking plate (7).

 (4)
 Remove the screw (6). NOTE : Carefully remove the plate so as not to cause damage to the

____
 sensor (5).


 (5)
 Disengage and hold the sensor (5).


 1EFF : ALL 1 34-11-19Page 403 1 1 Aug 01/05 1 1 1CES 1


 (6)
 Disconnect the connector (1).

 (7)
 Remove the angle of attack sensor (5).

 (8)
 Remove and discard the seal (3).

 (9)
 Put blanking caps on the disconnected electrical connectors (1) and (9).


 1EFF : ALL 1 34-11-19Page 404 1 1 Aug 01/05R 1 1 1CES 1


 TASK 34-11-19-400-001
 Installation of the Angle of Attack Sensor (3FP1, 3FP2, 3FP3)

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 1.6 m (5 ft. 3 in.)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
3 seal 34-11-02 01 -070 3 seal 34-11-02 01A-070
 1EFF : ALL 1 34-11-19Page 405 1 1 Aug 01/05R 1 1 1CES 1


 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
20-28-00-720-005  Check of the Electrical Bonding of the Different Components (But not the Fluid Systems and the Components Installed on Composite materials)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NAVIGATION 导航1(89)