(a)
In the zone 123 for the Total Pressure ADM 19FP1 and 19FP3.
(b)
In the zone 122 for the Total Pressure ADM 19FP2.
(c)
In the zone 128 for the Static Pressure ADM 19FP4, 19FP5, 19FP6 and 19FP7.
(d)
In zone 110 for the Static Pressure ADM 19FP8.
(e)
At the access door 822.
(2)
Make sure that the access door are open:
FOR 19FP1, 19FP3
812
FOR 19FP2
822
FOR 19FP5, 19FP7
824
FOR 19FP8
811
FOR 19FP4, 19FP6
824
(3)
Make sure that the protective cover is removed from the battery power center 105VU.
(4)
Clean the component interface and/or the adjacent area.
(5)
Do an inspection of the component interface and/or the adjacent area.
1EFF : ALL 1 34-11-17Page 411 1 1 Feb 01/00R 1 1 1CES 1
Subtask 34-11-17-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 19FP1, 19FP4, 19FP5
49VU NAV PROBES/ADIRU1/115VAC 4FP1 F06 105VU ADIRS/ADIRU1/28VDC 6FP1 C02 FOR 19FP2, 19FP6, 19FP7
**ON A/C 001-049, 051-061, 101-105, 201-203,
121VU ADIRS/ADIRU/2/115VAC 4FP2 N07
121VU ADIRS/ADIRU/2/28VDC 6FP2 N05
R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
121VU ADIRS/ADIRU/2/115VAC 4FP2 N06
121VU ADIRS/ADIRU/2/28VDC 6FP2 N04
**ON A/C ALL
FOR 19FP3, 19FP8
**ON A/C 001-049, 051-061, 101-105, 201-203,
121VU ADIRS/ADIRU/3/115VAC 4FP3 N06
121VU ADIRS/ADIRU/3/28VDC 6FP3 N04
R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
121VU ADIRS/ADIRU/3/115VAC 4FP3 N05 121VU ADIRS/ADIRU/3/28VDC 6FP3 N03
1EFF : ALL 1 34-11-17Page 412 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
4. Procedure
_________
**ON A/C 001-049, 051-061, 101-102, 151-199, 201-202,
(Ref. Fig. 401/TASK 34-11-17-991-001) R **ON A/C 062-099, 103-149, 203-299, 301-399, 401-499,
(Ref. Fig. 401A/TASK 34-11-17-991-001-A)
**ON A/C ALL
Subtask 34-11-17-420-050
A. Installation of the ADM
(1)
Put the ADM (2) in position on its support and hold it in this position.
(2)
Attach the ADM (2) with the four screws (3) and the washers (4).
(3)
Remove the blanking caps from the disconnected electrical connectors
(7) and (8). Make sure that the electrical connectors are in the correct condition.
(4)
Remove the blanking plugs from the disconnected quick-disconnect couplings (5) and (6). Make sure that the quick-disconnect couplings are in the correct condition.
(5)
Connect the electrical connector (7).
(6)
Connect the quick-disconnect coupling (6).
NOTE : After the connection:
____
-make sure that a colored ring is shown on the quick-disconnect coupling
-pull the connectors to be sure that they are correctly attached.
1EFF : ALL 1 34-11-17Page 413 1 1 Aug 01/05 1 1 1CES 1 Subtask 34-11-17-710-050
R B. Do the SYSTEM TEST of the ADR with the CFDS
(Ref. TASK 34-13-00-740-003).
NOTE : As an alternative procedure, you can do this operational test
____
without the CFDS (Ref. TASK 34-11-17-710-001).
5. Close-up
________
Subtask 34-11-17-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access door :
FOR 19FP1, 19FP3
812
FOR 19FP2
822
FOR 19FP4, 19FP5, 19FP6, 19FP7
824 (Ref. TASK 52-41-00-410-002)
FOR 19FP8
811
(3)
Remove the warning notice(s).
(4)
Install the protective cover on the battery power center 105VU.
(5)
Tighten the two screws.
(6)
Close the access door 822.
(7)
Remove the access platform(s).