• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:09来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 5. Close-up
________
 Subtask 34-13-00-860-066

 A. Put the aircraft back to its initial configuration.
 (1)
 On the CAPT and F/O EFIS control sections of the FCU, push the baro reference selector knob.

 (2)
 Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).


 (3) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002). R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 34-13-00-865-072
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CC1, 5CC2
 **ON A/C ALL
 Subtask 34-13-00-860-064
 C. Close Access
 (1)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).


 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Put the aircraft back to the serviceable condition.


 1EFF : ALL 1 34-13-00Page 519 1 1 Aug 01/05 1 1 1CES 1


 TASK 34-13-00-710-004 Operational Test of the ALT DYNAMIC SLEW TEST WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 1.
 Reason for the Job

__________________
 This test simulates a change in altitude.


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 1.6 m (5 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-010 Procedure to Get Access to the SYSTEM REPORT/TEST NAV
 Page 34-10-00-860-002 ADIRS Start Procedure 34-10-00-860-005 ADIRS Stop Procedure
 3. Job Set-up
__________ Subtask 34-13-00-860-067
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 1EFF : ALL 1 34-13-00Page 520 1 1 Nov 01/00R 1 1 1CES 1


 Subtask 34-13-00-010-058
 B. Get Access
 (1)
 Put the access platform in position at the access door 822.

 (2)
 Open the access door 822

 (3)
 On the battery power center 105VU:


 -loosen the two screws and remove the protective cover
 Subtask 34-13-00-865-067
 C. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU NAV PROBES/ADIRU3/PWR/SWTG 8FP F09 49VU NAV PROBES/ADIRU 1/AND AOA 1/26VAC 5FP1 F07 49VU NAV PROBES/ADIRU1/115VAC 4FP1 F06
 105VU ADIRS/ADIRU1/28VDC 6FP1 C02
 **ON A/C 001-049, 051-061, 101-105, 201-203,
 121VU ADIRS/ADIRU/2PWR/SHED 10FP N11 121VU ADIRS/ADIRU/3PWR/SWTG 9FP N10 121VU ADIRS/ADIRU/2/26VAC AND AOA 5FP2 N09 121VU ADIRS/ADIRU/3/26VAC AND AOA 5FP3 N08 121VU ADIRS/ADIRU/2/115VAC 4FP2 N07 121VU ADIRS/ADIRU/3/115VAC 4FP3 N06 121VU ADIRS/ADIRU/2/28VDC 6FP2 N05 121VU ADIRS/ADIRU/3/28VDC 6FP3 N04
R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU ADIRS/ADIRU/2PWR/SHED 10FP N10 121VU ADIRS/ADIRU/3PWR/SWTG 9FP N09 121VU ADIRS/ADIRU/2/26VAC AND AOA 5FP2 N08 121VU ADIRS/ADIRU/3/26VAC AND AOA 5FP3 N07 121VU ADIRS/ADIRU/2/115VAC 4FP2 N06 121VU ADIRS/ADIRU/3/115VAC 4FP3 N05 121VU ADIRS/ADIRU/2/28VDC 6FP2 N04 121VU ADIRS/ADIRU/3/28VDC 6FP3 N03
 1EFF : ALL 1 34-13-00Page 521 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,

 

 Subtask 34-13-00-865-073
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AUTO FLT/FAC1/28VDC 5CC1 B04 121VU AUTO FLT/FAC2/28VDC 5CC2 M19
 **ON A/C ALL
 Subtask 34-13-00-860-069
 E. Aircraft Maintenance Configuration
 (1)
 Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NAVIGATION 导航1(155)