ACTION RESULT -------------------------------------------------------------------------------
8. Refer to the indications in the You must get the same results on the parentheses specified in the F/O side. para. 1 to 5 and do the ADR2 test.
5. Close-up
________ Subtask 34-11-00-860-053
A. Put the aircraft back to its initial configuration.
(1)
Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(2)
On the ADIRS CDU, set the 3 OFF/NAV/ATT selector switches to OFF.
(3)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
Subtask 34-11-00-410-051
B. Close Access
(1)
Install the protective cover of the 105VU with two bolts.
(2)
Close the access door 822.
(3)
Remove the access platform(s).
1EFF : ALL 1 34-11-00Page 511 1 1 Feb 01/00R 1 1 1CES 1
TASK 34-11-00-710-002
Test of the Monitoring of the ADIRS Power Supply (115VAC-28VDC)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
3. Job Set-up
__________ Subtask 34-11-00-010-052
A. Get Access
(1)
Put the access platform in position in zone 126 at the access door
822.
(2)
Open the access door 822.
(3)
On the battery power center 105VU:
-loosen the two screws and remove the protective cover.
1EFF : ALL 1 34-11-00Page 512 1 1 Feb 01/98 1 1 1CES 1 Subtask 34-11-00-860-054
B. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(2)
Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(3)
On the overhead panel:
-
On the FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are not pushed (in). The OFF legends are on.
-
On the ADIRS CDU, on the panel 20VU, make sure that the 3 OFF/NAV/ATT selector switches are at OFF.
-
On the ELEC panel 35VU, make sure that the battery voltage is correct, between 26VDC and 30VDC.
NOTE : This test is for the system 1. For the systems 2 and 3, use
____ the indications between the parentheses.
Subtask 34-11-00-865-054
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 49VU NAV PROBES/ADIRU 1/AND AOA 1/26VAC 5FP1 F07 49VU NAV PROBES/ADIRU1/115VAC 4FP1 F06
105VU ADIRS/ADIRU1/28VDC 6FP1 C02
R **ON A/C 001-049, 051-061, 101-105, 201-203,
121VU ADIRS/ADIRU/2PWR/SHED 10FP N11 121VU ADIRS/ADIRU/3PWR/SWTG 9FP N10 121VU ADIRS/ADIRU/2/26VAC AND AOA 5FP2 N09 121VU ADIRS/ADIRU/3/26VAC AND AOA 5FP3 N08 121VU ADIRS/ADIRU/2/115VAC 4FP2 N07 121VU ADIRS/ADIRU/3/115VAC 4FP3 N06 121VU ADIRS/ADIRU/2/28VDC 6FP2 N05 121VU ADIRS/ADIRU/3/28VDC 6FP3 N04
中国航空网 www.aero.cn