-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
ANTI-ICE PROBES 2 STATIC-5DA2 or ANTI-ICE PROBES 3 STATIC-5DA3.
3.
Close the circuit breaker(s) that you opened before.
4.
On the overhead panel, on the PROBE/WINDOW HEAT section of the panel 25VU :
-release the AUTO pushbutton switch.
5.
Close-up
________
Subtask 34-11-16-860-051
- on the upper ECAM display unit, thisindication comes into view:ANTI ICE CAPT L STAT (R STAT) or, ANTI ICE F/O L STAT (R STAT) or, ANTI ICE STBY L STAT (R STAT).
- on the panels 131VU and 132VU, theMASTER CAUT lights go off. - on the upper ECAM display unit, the MEMO page comes into view.
-the ON legend goes off.
A. Put the aircraft back to its initial configuration.
(1)
On the center pedestal, on the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
(2)
Do the ADIRS Stop Procedure(Ref. TASK 34-10-00-860-005).
(3)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
1EFF : ALL 1 34-11-16Page 503 1 1 Feb 01/98 1 1 1CES 1 MODULE - AIR DATA (19FP1,19FP2,19FP3,19FP4,19FP5,19FP6,19FP7,19FP8)
___________________________________________________________________ REMOVAL/INSTALLATION
____________________
TASK 34-11-17-000-001
Removal of the Air Data Module (19FP1,19FP2,19FP3,19FP4,19FP5,19FP6,
19FP7,19FP8)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific warning notice
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-061, 101-102, 151-199, 201-202,
34-11-17-991-001 Fig. 401 R **ON A/C 062-099, 103-149, 203-299, 301-399, 401-499,
34-11-17-991-001-A Fig. 401A
1EFF : ALL 1 34-11-17Page 401 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL
3. Job Set-up
__________
Subtask 34-11-17-010-050
A. Get Access
(1)
Put the access platform in position :
(a)
In the zone 123 for the Total Pressure ADM 19FP1 and 19FP3.
(b)
In the zone 122 for the Total Pressure ADM 19FP2.
(c)
In the zone 128 for the Static Pressure ADM 19FP4, 19FP5, 19FP6 and 19FP7.
(d)
In zone 110 for the Static Pressure ADM 19FP8.
(e)
At the access door 822.
(2)
Open the access door :
FOR 19FP1, 19FP3
812
FOR 19FP2
822
FOR 19FP5, 19FP7
824
FOR 19FP8
811
FOR 19FP4, 19FP6
824
(3)
Open the access door 822.
(4)
On the battery power center 105VU: -loosen the two screws and remove the protective cover.