曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
This document outlines the operational approval process for special (non-14CFR Part 97) RNP
SAAAR operations and addresses the implementation of special aircraft and aircrew authorization
requirements similar to current ILS Category II/III approvals
• AC 90-101 Approval for RNP procedures with Special Aircraft and Aircrew
Authorization Required (SAAAR)
Airworthiness, Operational Approval, Operating Procedures, and Training guidance for RNP SAAAR
Instrument Approach Procedures
• AC 20-153 Acceptance of Data Processes and Associated Navigation
Databases
How to evaluate whether data processes comply with the requirements of RTCA/DO-200A,
Standards for Processing Aeronautical Data
How to obtain a Letter of Acceptance (LOA) from the Federal Aviation Administration (FAA)
How to define the aeronautical data quality requirements when obtaining airworthiness approval of
new equipment or installations where the function of the equipment is dependent on an updateable
database
Federal Aviation 7
Administration 7
RNAV and RNP 2005 Accomplishments and
Plans for 2006
2 Revised
22 Revised
158
34 New
63 New
23
14
In Development
FY06
Total 89 167
RNP SAAAR 6 25
SIDs/STARs 58 98
RNAV Q-Routes 21 28
RNAV T-Routes 4 16
and GPS MEAs
Funding Plan
FY07
Completed
FY05
Description
Federal Aviation 8
Administration 8
Atlanta RNAV Departure Procedures
• Approx 90% of 1350 daily IFR
departures are RNAV capable
• Structured “lanes” to en route
airspace
• Over 4,000 routine daily
pilot/controller voice transmissions
eliminated (30% reduction)
• Validated model estimates of
annualized benefits are ~$39M
Realized from delay and capacity
benefits
Before RNAV
After RNAV
Federal Aviation
Administration 9
Before
After
RNAV
ATL Efficiency
Benefits (2)
Federal Aviation 10
Administration 10
Dallas Fort Worth RNAV Departure Procedures
2004 Environment
(Pre-RNAV)
RNAV
• Approx 85% of 990 daily IFR
departures are RNAV capable
• Structured “lanes” to en route airspace
• Over 3,700 routine daily pilot/controller
voice transmissions eliminated (40%
reduction)
• Validated estimates ~$8.5M annual
benefits
Realized from delay and capacity
benefits
Up to ~$13M with 100% RNAV
Fanned departure operations
on initially diverging RNAV routes
Pre
Implementation
Post
Implementation
Conventional
Departures
RNAV
Departures
Federal Aviation 11
Administration 11
RNP SAAAR Approach Site Prioritization
• Single runway access and risk mitigation
• Predominantly future airspace de-confliction
Tier 3
• Regional capacity impact
• Access and risk mitigation enhancement
Tier 2
• Includes converting 2004/2005 specials to public
• Urgent capacity needs, with national impact
• Risk mitigation cases
Tier 1
Airports Characteristics
Federal Aviation 12
Administration 12
Applications of RNP SAAAR Criteria
Approach minimums
lower than existing minima
Increased arrival and
departure rates for adjacent
airports involved
Arrival capacity gains up to
50% over single runway
operations
Arrival capacity gains
up to 60% over single
runway operations
Several hundred
runway ends
10 to 15 Top Airports 15 to 20 Top Airports 10 to 15 Top Airports
Single Runway
Access
Adjacent Airport
Operations
Converging
Operations
Parallel
Operations
750’ - <5000’
36
31
16
L
16R
9
Airport A
Airport B
36L
Conventional
36R
RNP
SAAAR – Special Aircraft and Aircrew Authorization Required
Federal Aviation 13
Administration 13
RNP SAAAR:
KDCA
• First “public” RNP SAAAR, published 1 Sept 05
FAA Order 8260.52 criteria
Avoids prohibited airspace
Significantly improves RWY 19 availability in low visibility
Federal Aviation 14
Administration 14
International Harmonization
• ICAO RNP Special Operations Requirements Study Group is
primary forum for harmonization
Members include Australia, Brazil, Canada, EUROCONTROL, France,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料19(152)