|______ GPM ||"NULL" ||(Pos.) |||______ GPM |||______ GPM |||______ GPM ||||"NULL" |(Pos.) ||||______ GPM ||||______ GPM |||||
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
29-11-00
ALL ú ú 10 Page 680P ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
| Right Aileron |
| [Flow No. Fig. 619 |
| Step 25] ______ ______ GPM |
| |
| Left Aileron |
| [Flow No. Fig. 619 |
| Step 26] ______ ______ GPM |
| |
| Elevators |
| --------- |
| |
| Left Elevator |
| [Flow No. Fig. 620 |
| Step 17] ______ ______ GPM |
| |
| Right Elevator |
| [Flow No. Fig. 620 |
| Step 18] ______ ______ GPM |
| |
| Rudder |
| ------ |
| [Flow No. Fig. 620 |
| Step 19] ______ ______ GPM |
| |
| "SEAL" Total ______ GPM | 2............................................................1
S 846-349
(17) Put the center hydraulic system back to its usual condition as follows:
(a) If you use the flowmeter technique, do these steps:
1) If you use an ACMP to pressurize the system, do these steps: a) Put the C HYD PUMPS ELEC 1 pump switch on the P5 panel
to the OFF position. b) Remove the flowmeter from the ACMP pressure line and connect the ACMP pressure line.
2) If you use a hydraulic service cart to pressurize the system, do these steps: a) Operate the hydraulic service cart to decrease the
system pressure to zero. b) Disconnect the service cart and install the caps on the airplane ground power connections.
(b) If you use the multimeter technique, do these steps: 1) Put the C HYD PUMPS ELEC 1 pump switch to the OFF position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
29-11-00
ALL ú ú 06 Page 680Q ú Jan 28/01
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 液压 CHAPTER 29 - HYDRAULIC POWER 1(156)