29-11-00
ALL ú ú 04 Page 650 ú Jun 20/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
3) Connect the multimeter to the clamp-on ac current probe.
WARNING:_______ KEEP PERSONS AND EQUIPMENT AWAY FROM ALL CONTROL SURFACES
WHEN YOU SUPPLY THE HYDRAULIC POWER. THE AILERONS,
ELEVATORS, RUDDER, FLAPS, SLATS, SPOILERS, AND STABILIZER
ARE FULLY POWERED SURFACES. INJURY TO PERSONS OR DAMAGE
TO EQUIPMENT CAN OCCUR WHEN YOU SUPPLY THE HYDRAULIC
POWER.
(b) Put the C HYD PUMPS ELEC 1 switch to the ON position.
S 866-193
(3)
Put the A/P ENGAGE C switch on the mode control panel on the P55 panel to CMD, to engage the center system autopilot.
S 866-194
(4)
Put the YAW DAMPER R switch on the P5 panel to the ON position.
S 866-195
(5)
Put the STAB TRIM C hydraulic cutout switch on the P10 panel on the control stand to the NORM position.
S 866-196
(6)
Let the center system operate for at least 15 seconds to let the leakage flow become stable.
S 976-197
(7)
Measure and write the leakage flow.
NOTE: This is the center system gross neutral leakage flow.
____
S 976-395
(8)
If the system gross leakage is more than 4.0 GPM, you must do the Full Hydraulic System Internal Leakage Check and Isolation of Components with High Leakage procedure.
S 366-199
(9)
Replace the components with high leakage as necessary to decrease the center system gross leakage to less than 4.0 GPM.
S 866-200
(10)
Put the A/P ENGAGE C switch on the mode control panel on the P55 panel to the OFF position.
(11)
Push the YAW DAMPER R switch on the P5 panel to the INOP position.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 液压 CHAPTER 29 - HYDRAULIC POWER 1(126)