the organisation has no longer aircraft under contract? 
2 – Airworthiness situation of the fleet 
·  Does the continuing airworthiness status (AD, maintenance programme, life limited components, deferred maintenance, ARC validity) show any expired items? If so, are the aircraft grounded? 
3 – Aircraft maintenance programme 
·  Check that all revisions to the TC/STC holders Instructions for Continuing Airworthiness, since the last review, have been (or are planned to be) incorp-orated in the maintenance programme, unless otherwise approved by the Competent Authority. 
·  Has the maintenance programme been revised to take into account all modifi-cations or repairs impacting the maintenance programme? 
·  Have all maintenance programme amendments been approved at the right level (competent authority or indirect approval)? 
·  Does the status of compliance with the maintenance programme reflect the latest approved maintenance programme? 
·  Has the use of maintenance programme deviations and tolerances been prop-erly managed and approved? 
4 – Airworthiness Directives (and other mandatory measures issued by the compe-tent authority) 
·  Have all ADs issued since the last review been incorporated into the AD status? 
·  Does the AD status correctly reflect the AD content: applicability, compliance date, periodicity…? (sample check on ADs) 
5 – Modifications/repairs 
·  Are all modifications/repairs listed in the corresponding status approved in accordance with M.A.304? (sample check on modifications/repairs) 
·  Have all the modifications/repairs which have been installed since the last review been incorporated in the corresponding status? (sample check from the aircraft/component logbooks) 
6 – Relations with the owners/operators 
·  Has a contract (in accordance with Annex I to Part M) been signed with each external owner/operator, covering all the aircraft whose airworthiness is man-aged by the CAMO? 
·  Have the owners/operators under contract fulfilled their obligations identified in the contract? As appropriate: 
–  
Are the pre-flight checks correctly performed? (interview of pilots)
–  
Are the technical log or equivalent correctly used (record of flight hours/ cycles, defects reported by the pilot, identification of what maintenance is next due etc.)?
–  
Did flights occur with overdue maintenance or with defects not properly rectified or deferred? (sample check from the aircraft records)
–  
Has maintenance been performed without notifying the CAMO (sample check from the aircraft records, interview of the owner/operator)?
7 – Personnel 
·  Check that the current accountable manager and other nominated persons are correctly identified in the approved CAME. 
·  If the number of personnel has decreased or if the activity has increased, check that the organisation still has sufficient staff. 
·  Check that the qualification of all new personnel (or personnel with new func-tions) has been appropriately assessed. 
·  Check that the staff has been trained, as necessary, to cover changes in: 
–  
regulations,
–  
competent authority publications,
–  
the CAME and associated procedures,
–  
the approved scope of work,
–  
maintenance data (significant ADs, SBs, ICA amendments, etc.).
8 – Maintenance contracted 
·  Sample check of maintenance records: 
–  
Existence and adequacy of the work order,
–  
Data received from the maintenance organisation: · Valid CRS including any deferred maintenance · List of removed and installed equipment and copy of the associated
 