• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 > EASA >

时间:2011-08-28 16:50来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

4.7  Airworthiness review records, responsibilities, retention and access.
Part 4B Permit to fly procedures
4B.1 Conformity with approved flight conditions;
4B.2 Issue of permit to fly under the CAMO privilege;
4B.3 Permit to fly authorised signatories;
4B.4 Interface with the local authority for the flight;
4B.5 Permit to fly records, responsibilities, retention and access.

Part 5 Appendices
5.1  Sample documents.
5.2  List of airworthiness review staff.
5.3  List of subcontractors as per AMC M.A.201(h) 1 and M.A.711(a)3.
5.4  List of approved maintenance organisations contracted.
5.5  Copy of contracts for subcontracted work (Appendix II to AMC M.A.201(h) 1).
5.6  Copy of contracts with approved maintenance organisations.
ED 2010/002/R

LIST OF EFFECTIVE PAGES

Page  Revision 
1  Original 
2  Original 

Page  Revision 
3  Original 
4  Original 

Page  Revision 
5  Original 
……  …… 

DISTRIBUTION LIST
(The document should include a distribution list to ensure proper distribution of the manual and to demonstrate to the competent authority that all personnel involved in continuing airworthiness has access to the relevant information. This does not mean that all personnel have to be in receipt of a manual but that a reasonable amount of manuals are distributed within the organisation(s) so that the concerned personnel may have quick and easy access to this manual.
Accordingly, the continuing airworthiness management exposition should be distributed to:
- the operator’s or the organisation’s management personnel and any person at a lower 
level as necessary; and, 
- the Part-145 or M.A. Subpart F contracted maintenance organisation(s); and, 
- the competent authority.) 

PART  GENERAL ORGANISATION
0.1 Corporate commitment by the accountable manager
(The accountable manager’s exposition statement should embrace the intent of the follow-ing paragraph and in fact this statement may be used without amendment. Any modifica-tion to the statement should not alter the intent.)
This exposition defines the organisation and procedures upon which the M.A. Subpart G approval of Joe Bloggs under Part-M is based.
These procedures are approved by the undersigned and must be complied with, as applic-able; in order to ensure that all the continuing airworthiness activities including mainten-ance for aircraft managed by Joe Bloggs is carried out on time to an approved standard.
It is accepted that these procedures do not override the necessity of complying with any new or amended regulation published by the Agency or the competent authority from time to time where these new or amended regulations are in conflict with these procedures.
The competent authority will approve this organisation whilst the competent authority is satisfied that the procedures are being followed. It is understood that the competent authority reserves the right to suspend, vary or revoke the M.A. Subpart G continuing airworthiness management approval of the organisation, as applicable, if the competent authority has evidence that the procedures are not followed and the standards not upheld.
In the case of commercial air transport, suspension or revocation of the approval of the Part M Subpart G continuing airworthiness management approval would invalidate the AOC.
0.2 General Information
a) Brief description of the organisation
(This paragraph should describe broadly how the whole organisation [i.e. including the whole operator in the case of commercial air transport or the whole organisation when other approvals are held] is organised under the management of the accountable manager, and should refer to the organisation charts of paragraph 0.4.)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CONTINUING AIRWORTHINESS REQUIREMENTS – PART M 2(56)