(6)
Remove the screws which attach the applicable switch and actuator assembly to the thrust lever.
(7)
Remove the switch and the actuator from the thrust lever.
(8)
Remove the heat shrink tubing from the wire terminals.
S 314-026-N00
(9)
Use the solder iron to remove the solder and the wires from the switch (AMM 20-11-25/201).
S 024-024-N00
S 034-025-N00
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
76-12-02
ALL ú ú N02 Page 403 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES /MAINTENANCE MANUAL ////////////////////////
A
A
SEE A
FLIGHT COMPARTMENT
CONTROL STAND A
0.10 INCH
MID TRAVEL POSITION
DISCONNECT LEVER AUTOTHROTTLE
AUTOTHROTTLE RESET SWITCH, S8 (S10)
SEE B S7 (S9) AUTOTHROTTLE DISCONNECT SWITCH, LEVER ACTUATOR
SWITCH
AFT
A-A THRUST LEVER NO. 1 (NO. 4 IS EQUIVALENT) B SCREWS MOUNTING
Autothrottle Disconnect Switch and Reset Switch - Removal/Installation
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
76-12-02
ALL ú ú N01 Page 404 ú Feb 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
A
SEE A
FLIGHT COMPARTMENT
CONTROL STAND
LEVER GO-AROUND SEE C A
STOP PIN
0.10 INCH GO-AROUND SWITCHES, S2,S4 (S1,S3)
MID TRAVEL POSITION SEE B
ACTUATOR
SWITCH ROLLER LEVER
THRUST REVERSER CONTROL SWITCH (AMM 78-34-06/401) GO-AROUND
SWITCH, S6 (S5) GO-AROUNDAFT SWITCH
THRUST LEVER NO. 3
MOUNTING (NO. 2 IS EQUIVALENT) SCREWS A-A B
Autothrottle Go-Around Switch - Removal/Installation
Figure 402 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
76-12-02
ALL ú ú N01 Page 405 ú Jun 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES /MAINTENANCE MANUAL ////////////////////////
STOP PIN
STEP 3
ADJUSTMENT STEPS
Autothrottle Go-Around Switch - Removal/Installation
Figure 402 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
76-12-02
ALL ú ú N01 Page 406 ú Jun 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
F78251
TASK 76-12-02-404-027-N00
3. Install the Autothrottle Disconnect (S7, S9) or Reset (S8, S10) Switches
________________________________________________________________________
A. General
(1)
This task applies to the autothrottle disconnect switches and the autothrottle reset switches.
(2)
Do not replace the two switches when only the one switch does not operate. You only have to replace the switch that does not operate.
B. Equipment
(1)
Heat gun
(2)
Soldering tool
(3)
Ohmmeter or continuity checker
C. Consumable Materials
(1) G02104 Heat Shrink Tubing - RT876, color yellow, Raychem Corp., Menlo Park, CA
D. References
(1)
AMM 20-11-25/201, Heat Guns and/or Soldering Guns
(2)
AMM 25-22-01/401, Main Passenger Cabin Ceiling Panels
(3)
AMM 76-11-03/201, Control Stand
(4)
AMM 76-12-02/501, Autothrottle Disconnect and Go-Around Switches
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 发动机控制 ENGINE CONTROLS(57)