- wiring of the L ELEV NOT AVAIL IN SEC2 (DSI05) signal
- wiring of the R ELEV NOT AVAIL IN SEC2 (DSI06) signal
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
31-32-00-810-932 Failure of the Discrete Links
AMM 27-94-34-000-001 Removal of the SEC (1CE1,1CE2,1CE3)
AMM 27-94-34-400-001 Installation of the SEC (1CE1,1CE2,1CE3)
AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)
ASM 27-92/32
ASM 27-92/33
ASM 27-92/34
ASM 27-92/35
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message CHECK PITCH CHANGE OVER OF SEC2:
- replace the SEC-2 (1CE2) (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
(1) If the fault continues:
(a) replace the SEC-1 (1CE1) (Ref. AMM TASK 27-94-34-000-001) (Ref. AMM TASK 27-94-34-400-001).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page B243
Aug 01/04R CES
(2) If the fault continues:
(a) do the trouble shooting procedure (Ref. TASK 31-32-00-810-932) to the DSI 11 and DSI 22 discret input signal of the SEC 1 COM and MON (Ref. ASM 27-92/32).
(3) If the fault continues:
(a) Do a check of the wiring of the PITCH NOT AVAIL IN ELAC2 (DSI10 and DSI26) signals from the SEC2 (1CE2) COM part and MON part to the first terminal block (Ref. ASM 27-92/32):
- if there is continuity, see Para. (b)
- if there is no continuity, repair the above wiring.
(b) Do a check of the wiring of the PITCH NOT AVAIL IN ELAC1 (DSI11 and DSI22) signals from the SEC2 (1CE2) COM part and MON part to the first terminal block (Ref. ASM 27-92/33):
- if there is continuity, see Para. (c)
- if there is no continuity, repair the above wiring.
(c) Do a check of the wiring of the L ELEV NOT AVAIL IN SEC1 (DSI13 and DSI27) signals from the SEC2 (1CE2) COM part and MON part to the first terminal block (Ref. ASM 27-92/35):
- if there is continuity, see Para. (d)
- if there is no continuity, repair the above wiring.
(d) Do a check of the wiring of the R ELEV NOT AVAIL IN SEC1 (DSI15 and DSI23) signals from the SEC2 (1CE2) COM part and MON part to the first terminal block (Ref. ASM 27-92/35):
- if there is continuity, see Para. (e)
- if there is no continuity, repair the above wiring.
(e) Do a check of the wiring of the L ELEV NOT AVAIL IN SEC2 (DSI05) signal from the SEC2 (1CE2) COM part and MON part to the first terminal block (Ref. ASM 27-92/34):
- if there is continuity, see Para. (f)
- if there is no continuity, repair the above wiring.
(f) Do a check and repair the wiring of the R ELEV NOT AVAIL IN SEC2 (DSI06) signal from the SEC2 (1CE2) COM part and MON part to the first terminal block (Ref. ASM 27-92/34).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page B244
Aug 01/04R
CES Loss of the Side Stick Priority Signal for One ELAC
1. Possible Causes
_______________
- ELAC-1 (2CE1)
- ELAC-2 (2CE2)
- wiring of the STICK PRIORITY CAPT (DSI35) and STICK PRIORITY F/O (DSI36) signals
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)
AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)
AMM 27-96-00-710-003 Operational Test of the Side Stick Priority
AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)
ASM 27-92/17
3. Fault Confirmation
__________________
A. Test
(1) Do the operational test of the side stick priority (Ref. AMM TASK 27-96-00-710-003).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3(72)