- P/BSW-FLT CTL/SEC 1 (5CE1)
- wiring of the SEC DISCONNECTED IN THE RACK (DSI 12 and DSI 28) signals
- wiring of the PIN PROGRAM SEC1 (DSI 07) signal
- wiring of the DGO 03 signal
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
IPC 27920802 IPC 27920803 AMM 27-94-00-710-002 Operational Test of the Spoiler Elevator Computer 1
(SEC 1)
AMM 27-94-34-000-001 Removal of the SEC (1CE1,1CE2,1CE3)
AMM 27-94-34-400-001 Installation of the SEC (1CE1,1CE2,1CE3)
AMM 27-95-34-000-001 Removal of the FCDC (3CE1,3CE2)
AMM 27-95-34-400-001 Installation of the FCDC (3CE1,3CE2)
AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)
ASM 27-92/04
ASM 27-92/05
ASM 27-92/40
ASM 27-92/53
ASM 27-95/04
ASM 27-95/05
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-94-00∞∞∞∞∞∞∞∞∞∞Page A210
Feb 01/03R CES
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the test confirms the fault:
- do the operational test of the SEC1 (Ref. AMM TASK 27-94-00-710-002) to make sure that the SEC1 servoes its associated surfaces.
(1) If the flight controls move according to the SEC1 servoing:
(a) Remove the SEC1 (Ref. AMM TASK 27-94-34-000-001).
(b) At the SEC1 receptacle, do a check of the resistance between pin AB/12K and pin AE/12A (Ref. ASM 27-92/05).
1 If the resistance is less than 280 ohms:
_
a Remove the RELAY-SEC 1 ANN SPLY (41CE1) (Ref. IPC
_
27920803).
b Do a check of the resistance of the relay between pin X1
_
and X2.
- If the resistance is less than 280 Ohms: . replace the RELAY-SEC 1 ANN SPLY (41CE1) (Ref. IPC 27920803)
R . install the SEC1 (Ref. AMM TASK 27-94-34-400-001).
- If the resistance is between 280 and 400 ohms: . do a check and repair the wiring of the RLY SEC FAULT signal from the relay to the SEC (Ref. ASM 27-92/05) . install the relay . replace the SEC-1 (1CE1) (Ref. AMM TASK 27-94-34-400-001).
2 If the resistance is more than 400 ohms:
_
a Remove the relay (41CE1).
_
b Do a check of the resistance of the relay between pin X1
_
and X2.
- If the resistance is more than 400 ohms: . replace the RELAY-SEC 1 ANN SPLY (41CE1) (Ref. IPC 27920803) . install the SEC 1 (Ref. AMM TASK 27-94-34-400-001).
- If the resistance is between 280 and 400 ohms: . do a check and repair the wiring of the RLY SEC FAULT signal from the relay to the SEC (Ref. ASM 27-92/05) . install the relay
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-94-00∞∞∞∞∞∞∞∞∞∞Page A211
Aug 01/05 CES
. install the SEC 1 (Ref. AMM TASK 27-94-34-400-001).
3 If the resistance is between 280 and 400 ohms:
_
a Remove the FCDC-1 (3CE1) (Ref. AMM TASK 27-95-34-000-001).
_
- if the warning SEC1 stays, install the FCDC-1 (3CE1) (Ref. AMM TASK 27-95-34-400-001) and see Para. b_.
- if the warning SEC1 goes off, replace the FCDC-1 (3CE1) (Ref. AMM TASK 27-95-34-000-001) and (Ref. AMM TASK 27-95-34-400-001).
- install the SEC 1 (Ref. AMM TASK 27-94-34-400-001).
b Remove the FCDC-2 (3CE2) (Ref. AMM TASK 27-95-34-000-001).
_
- if the warning SEC1 stays, install the FCDC-2 (3CE2) (Ref. AMM TASK 27-95-34-400-001) and see Para. c_.
- if the warning SEC1 goes off, replace the FCDC-2 (3CE2) (Ref. AMM TASK 27-95-34-000-001) and (Ref. AMM TASK 27-95-34-400-001).
- install the SEC 1 (Ref. AMM TASK 27-94-34-400-001).
c Remove the RLY- SEC 1 ANN SPLY (41CE1) (Ref. IPC 27920803).
_
- if the warning SEC1 stays, install the RLY-SEC 1 ANN SPLY (41CE1) (Ref. IPC 27920803) and see Para. d_.
- if the warning SEC1 goes off, replace the RLY-SEC 1 ANN SPLY (41CE1) (Ref. IPC 27920803).
- install the SEC 1 (Ref. AMM TASK 27-94-34-400-001).
d Do a check and repair the wiring of the DSI 4/3 (SEC 1