3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
ELAC2 COM BUS2
or
ELAC2 MON BUS2
- replace the ELAC-2 (2CE2) (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).
(1) If the fault continues:
- do the trouble shooting procedure (Ref. TASK 31-32-00-810-934) to the DGO 02 digital output signal of the ELAC 2 COM and MON (Ref. ASM 27-92/52).
(2) If the fault continues:
- do a check and repair the wiring of the DGO 02 signal from the ELAC 2 (2CE2) to the first terminal block, COM or MON part as shown in the maintenance message (Ref. ASM 27-92/52).
B. Do the test given in Para. 3. R
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page B232
Aug 01/04 CES Loss of the SEC 2 BUS Signal for the ELAC 1
1. Possible Causes
_______________
- ELAC-1 (2CE1)
- wiring of the DGI 14 signal from the ELAC 1 (2CE1) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)
AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)
AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)
ASM 27-92/54
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
ELAC1 OR BUS FROM SEC2
- replace the ELAC-1 (2CE1) (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).
(1) If the fault continues:
- do a check and repair the wiring of the DGI 14 signal from the ELAC 1 (2CE1) to the first terminal block (Ref. ASM 27-92/54).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page B233
Aug 01/04R
CES Loss of the SEC 2 BUS Signal for the ELAC 2
1. Possible Causes
_______________
- ELAC-2 (2CE2)
- wiring of the DGI 14 signal from the ELAC 2 (2CE2) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)
AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)
AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)
ASM 27-92/54
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
ELAC2 OR BUS FROM SEC2
- replace the ELAC-2 (2CE2) (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).
(1) If the fault continues:
- do a check and repair the wiring of the DGI 14 signal from the ELAC 2 (2CE2) to the first terminal block (Ref. ASM 27-92/54).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page B234
Aug 01/04R
CES Loss of the SEC 1 BUS Signal for the ELAC 1
1. Possible Causes
_______________
- ELAC-1 (2CE1)
- wiring of the DGI 14 signal from the ELAC 1 (2CE1) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3(68)