- replace the SEC-1 (1CE1) (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
(1) If the fault continues:
- replace the FCDC-1 (3CE1) (Ref. AMM TASK 27-95-34-000-001) and (Ref. AMM TASK 27-95-34-400-001).
(2) If the fault continues:
- do a check and repair the wiring of the DGI 10 signal from the SEC1 (1CE1) to the FCDC 1 (3CE1) (Ref. ASM 27-95/02).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-94-00∞∞∞∞∞∞∞∞∞∞Page A231
Feb 01/03R CES
Loss of the FCDC 2 BUS 3 Signal for the SEC 1
1. Possible Causes
_______________
- SEC-1 (1CE1)
- wiring of the DGI 10 signal from the SEC 1 (1CE1) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-94-34-000-001 Removal of the SEC (1CE1,1CE2,1CE3) AMM 27-94-34-400-001 Installation of the SEC (1CE1,1CE2,1CE3) AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-95/03
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
SEC1 MON OR BUS3 FROM FCDC2
- replace the SEC-1 (1CE1) (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
(1) If the fault continues:
- do a check and repair the wiring of the DGI 10 signal from the SEC1 (1CE1) to the first terminal block (Ref. ASM 27-95/03).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-94-00∞∞∞∞∞∞∞∞∞∞Page A232
Feb 01/03R
CES Loss of the FCDC 1 BUS 5 Signal for the SEC 2
1. Possible Causes
_______________
- SEC-2 (1CE2)
- wiring of the DGI 10 signal from the SEC 2 (1CE2) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-94-34-000-001 Removal of the SEC (1CE1,1CE2,1CE3) AMM 27-94-34-400-001 Installation of the SEC (1CE1,1CE2,1CE3) AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-95/02
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the EFCS (ground scanning) (Ref. AMM TASK 27-96-00-740-001).
4. Fault Isolation
_______________
A. If the BITE test gives the maintenance message:
SEC2 MON OR BUS5 FROM FCDC1
- replace the SEC-2 (1CE2) (Ref. AMM TASK 27-94-34-000-001) and (Ref. AMM TASK 27-94-34-400-001).
(1) If the fault continues:
- do a check and repair the wiring of the DGI 10 signal from the SEC2 (1CE2) to the first terminal block (Ref. ASM 27-95/02).
B. Do the test given in Para. 3.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-94-00∞∞∞∞∞∞∞∞∞∞Page A233
Feb 01/03R
CES Loss of the FCDC 1 BUS 5 Signal for the SEC 3
1. Possible Causes
_______________
- SEC-3 (1CE3)
- wiring of the DGI 10 signal from the SEC 3 (1CE3) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 27-94-34-000-001 Removal of the SEC (1CE1,1CE2,1CE3) AMM 27-94-34-400-001 Installation of the SEC (1CE1,1CE2,1CE3) AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-95/02
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3(128)