• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-02 14:28来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

CONTENTS

Page 3 Apr 11/2002 D623N005
THIS PAGE INTENTIONALLY LEFT BLANK


LIST OF FIGURES
Figure Title Page
2-1 PRINCIPAL AIRPLANE DIMENSIONS 757-200 2-2 2-2 PRINCIPAL AIRPLANE DIMENSIONS 757–300 2-3 2-3 PW2000 SERIES ENGINE COMPONENT WEIGHTS 2-5 2-4 ENGINE COMPONENTS -LEFT SIDE 2-6 2-5 ENGINE COMPONENTS -RIGHT SIDE 2-7 2-6 BARE ENGINE DIMENSIONS 2-9 2-7 NACELLE ASSEMBLIES 2-16 2-8 THRUST REVERSER 2-17 2-9 ENGINE AND NACELLE DIMENSIONS 2-18 2-10 NACELLE COMPONENT WEIGHTS AND CG 2-19 2-11 STRUT FAIRING INSTALLATION 2-21 2-12 STRUT AND ENGINE MOUNT INSTALLATION 2-23 2-13 FORWARD ENGINE MOUNT 2-24 2-14 AFT ENGINE MOUNT 2-25 3-1 ENGINE GROUND HANDLING POINTS 3-3 3-2 FRONT GROUND HANDLING PAD LOCATIONS 3-4 3-3 REAR GROUND HANDLING POINT LOCATIONS 3-5 3-4 ENGINE SLING 3-7 3-5 BOOTSTRAP INSTALLATION -FORWARD AND AFT 3-10 3-6 INLET COWL SLING 3-12 3-7 INLET COWL DOLLY 3-13 3-8 ACTUATOR HAND PUMP INSTALLATION 3-14 3-9 THRUST REVERSER HOLD-OPEN 3-16 3-10 THRUST REVERSER HANDLING EQUIPMENT 3-17 3-11 TRANSLATING SLEEVE REMOVAL 3-18 3-12 CORE COWL SLING 3-19 3-13 CORE COWL HOLD-OPEN 3-21 3-14 EXHAUST SLEEVE REMOVAL 3-22 3-15 BASIC STRUT DESIGN 3-23 3-16 STRUT INSTALLATION/REMOVAL SLING 3-24 3-17 STRUT PRELOAD FIXTURE 3-25 3-18 NACELLE SIDE LINK ALIGNMENT FIXTURE 3-26 3-19 STRUT UNLOAD SLING WITH THE ENGINE INSTALLED 3-27 3-20 CRADLE AND TRANSPORTATION STAND 3-30

LIST OF FIGURES

Page 1 Apr 11/2002 D623N005
 

Figure Title Page
3-21 CRADLE AND TRANSPORTATION STAND 3-31 4-1 LIFT FIXTURE -ENGINE ACCESSORY 4-2 4-2 INTEGRATED DRIVE GENERATOR INSTALLATION/REMOVAL EQUIPMENT 4-3 4-3 PRECOOLER HANDLING EQUIPMENT 4-4 5-1 ENGINE AIR TRANSPORT CAPABILITY -PW2000 SERIES 5-3 5-2 PW2000 SERIES SPLIT-ENGINE AIR TRANSPORT -POTENTIAL 5-4 5-3 3-PALLET SPLIT-ENGINE TRANSPORTATION SYSTEM 5-5 5-4 PW2000 SERIES ENGINE TRANSPORT ON BOEING AIRPLANES 5-6 5-5 PRIMARY FRONT GROUND HANDLING -SIDE PICKUP 5-9 5-6 SECONDARY FRONT GROUND HANDLING -TOP PICKUP 5-11 5-7 ALLOWABLE LIMITS 5-12 5-8 PRIMARY REAR GROUND HANDLING -SIDE PICKUP 5-13 5-9 SECONDARY REAR GROUND HANDLING -TOP PICKUP 5-14 5-10 FORWARD ADAPTER CONCEPT -PW2000 SERIES 5-15 5-11 TRANSPORTATION STAND LOAD FACTORS 5-16 6-1 INTERFACE CONNECTORS (ENGINE) 6-8 6-2 FUEL AND HYDRAULIC INTERFACE CONNECTORS 6-8 6-3 ELECTRICAL INTERFACE CONNECTORS 6-9 6-4 ENGINE SERVICE INTERFACES -LEFT SIDE 6-11 6-5 ENGINE SERVICE INTERFACES -RIGHT SIDE 6-12 6-6 ELECTRICAL WIRING DIAGRAMS 6-13 6-7 ENGINE PRECOOLER DUCT INTERFACES 6-18

LIST OF FIGURES

Page 2 Apr 11/2002 D623N005
 

PURPOSE
This document provides basic information for operators in handling propulsion components during on-aircraft maintenance and engine build up.
ACRONYMS AND ABBREVIATIONS
Active Clearance Control (ACC)
ASSY (Assembly)Buttock Line (BL)

Body Buttock Line (BBL)
Center of Gravity (CG)
DIA (Diameter)Engine Build Up (EBU)

Electronic Engine Control (EEC)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 PW2000 Series Engine Ground Handling Document 发动机地面处理文件(4)