• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-09-28 12:39来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 C.  Removal/installation procedures are the same for all actuators.
 D.  This procedure contains two tasks. The first task is to remove the actuator of the fueling shutoff valve. The second task is to install the actuator of the fueling shutoff valve.
 TASK 28-21-12-004-001
 2.  Remove the Actuator of the Fueling Shutoff Valve (Fig. 401)________________________________________________
 A.  References
 (1)  
AMM 06-44-00/201, Wing Access Doors and Panels

 (2)  
AMM 24-22-00/201, Electric Power Control

 (3)  
AMM 32-00-15/201, Landing Gear Door Locks

 (4)  
AMM 32-00-20/201, Landing Gear Downlocks

 B.  
Access

 (1)  
Location Zones
 551 Rear Spar to MLG Support Beam (Left)
 651 Rear Spar to MLG Support Beam (Right)


 (2)  
Access Panels
 551EBX Access Door (Left)
 651EBX Access Door (Right)


 C.  
Procedure


 S 864-002
 (1)  
Open these circuit breakers on the overhead circuit breaker panel, P11, and attach the DO-NOT-CLOSE tags:

 (a)  
11C34, FUEL QTY 1 OR FUEL QTY L

 (b)  
11L19, FUEL QTY 2 OR FUEL QTY R


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-21-12
 ALL  ú ú 03 Page 401 ú May 28/99

A

757
MAINTENANCE MANUAL

SEEA SEEA
BOLT (3 LOCATIONS) 
REAR SPAR (DRY SIDE) 
SEE  B  O-RING  WASHER (3 LOCATIONS) 
BOLT (EXAMPLE)
ACTUATOR 

RETAINING NUT ACTUATOR  O-RING O-RING 
REAR SPAR 
ELECTRICAL CONNECTOR 
A  B 

Fueling Shutoff Valve Actuator Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-21-12
 ALL  ú ú 01 Page 402 ú May 28/99

A
757 MAINTENANCE MANUAL
 S 864-004
 (2)  
Open these circuit breakers on the power distribution panel, P6, and attach the DO-NOT-CLOSE tags:

 (a)  
6E4, FUELING QTY

 (b)  
6E5, FUELING CONTROL

 (c)  
6E6, FUELING VALVE


 S 864-003
 (3)  
Open these circuit breakers on the APU external power panel, P34, and attach the DO-NOT-CLOSE tags:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 燃油 CHAPTER 28 - FUEL 2(88)