• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-09-28 12:39来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Remove the screws (7 thru 12) that attach the adapter to the fueling adapter body.

 (9)  
Remove the adapter.


 S 024-005
 TASK 28-21-01-404-006
 3. Install the Fueling Adapter (Fig. 401)
___________________________
 A. References
 (1)  
AMM 06-44-00/201, Wings (Major Zones 500 and 600) Access Doors and Panels

 (2)  
AMM 12-11-01/301, Fuel Tank Pressure Fueling

 (3)  
AMM 27-81-00/201, Leading Edge Slat System


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-21-01
 ALL  ú ú 01 Page 403 ú May 20/98

A

757
MAINTENANCE MANUAL

 B. Access
 (1)  
Location Zone
 621 Leading Edge to Front Spar (Right)


 (2)  
Access Panel
 621GB Fueling Station Door (Right)


 C.
Procedure


 S 424-007
 (1)  
Align the adapter with the fueling adapter body.

 S 434-031

 (2)
Install the screws (7 thru 12) in the sequence shown (View B).

 S 434-032

 (3)
Tighten the screws (7 thru 12) to 28-30 pound-inches in sequence.


 NOTE: Screws 7 thru 12 attach the adapter to the fueling
____
 adapter body.

 S 654-034
 (4)  
Refuel the fuel tanks (AMM 12-11-01/301).

 S 214-035

 (5)  
Make sure there are no fuel leaks at the fueling adapter.

 S 414-036

 (6)  
Close the fueling station door, 621GB (AMM 06-44-00/201).


 S 864-037
 WARNING: DO THE ACTIVATION PROCEDURE FOR THE LEADING EDGE SLAT PROCEDURE
_______ (AMM 27-81-00/201) ACCIDENTAL SLAT OPERATION COULD CAUSE INJURY TO PERSONS.
 (7)  Do the activation procedure for the leading edge slat procedure (AMM 27-81-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-21-01
 ALL  ú ú 01 Page 404 ú May 20/98

A

757 MAINTENANCE MANUAL
 S 944-084
 (8)  
Remove the ropes and DANGER - OPEN FUEL TANKS signs from around the fueling station.

 S 494-085

 (9)  
Connect the airplane battery and remove the OPEN FUEL TANK - DO NOT CONNECT signs.

 S 914-086
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 燃油 CHAPTER 28 - FUEL 2(66)