• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-05-24 14:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Page 102 Doc # 6.02.01 09 Jan 2003 Rev. 4
34-25-00
Navigation
AMM

Maintenance Practices
1. General
This Section tells you how to remove/install the integrated gyro instruments.
CAUTION:  Be specially careful when you work on or move gyroscopic instruments. Make sure that the gyro stops turning before you start to remove the instrument. Use only the correct shock-proof container for shipping. Mark the container ‘VERY FRAGILE’ ‘HANDLE LIKE EGGS’.
2. Remove/Install an Integrated Gyro Instrument
% A. Remove an Integrated Electrical Gyro Instrument

Detail Steps/Work Items  Key Items/References 
(1)  Pull the related circuit-breaker.  T&B for the turn & bank indicator. HORIZON for the attitude gyro. DG for the directional gyro. 
(2)  Remove the instrument panel cover.  Refer to Section 25-10. 
(3)  Dis-connect the connector at the rear of the instrument. 
(4)  Remove the screws which attach the instrument to the instrument panel.  Hold the instrument! 
(5)  Remove the instrument from the instrument panel. 

Doc # 6.02.01 Page 201
Rev. 4 09 Jan 2003

34-25-00
AMM

% B. Install an Integrated Electrical Gyro Instrument

Detail Steps/Work Items  Key Items/References 
(1)  Put the instrument in position in the instrument panel. 
(2)  Install the screws which attach the instrument to the instrument panel. 
(3)  Connect the connector at the rear of the instrument. 
(4)  Install the instrument panel cover.  Refer to Section 25-10. 
(5)  Set the related circuit-breaker.  T&B for the turn & bank indicator. HORIZON for the attitude gyro. DG for the directional gyro. 

% C. Remove an Integrated Vacuum Gyro Instrument
%

%

%
%
%

%

%
%
%

%

Detail Steps/Work Items  Key Items/References 
(1)  Remove the instrument panel cover.  Refer to Section 25-10. 
(2)  Disconnect the vacuum hoses at the rear of the instrument. 
(3)  Disconnect the electrical connector for the instrument light. 
(4)  Remove the screws which attach the instrument to the instrument panel.  Hold the instrument! 
(5)  Remove the instrument from the instrument panel. 

Page 202 Doc # 6.02.01 09 Jan 2003 Rev. 4
34-25-00
Navigation
AMM

%

%

%
%
%

%

%
%
%

%

% D. Install an Integrated Vacuum Gyro Instrument

Detail Steps/Work Items  Key Items/References 
(1)  Put the instrument in position in the instrument panel. 
(2)  Install the screws which attach the instrument to the instrument panel. 
(3)  Connect the electrical connector for the instrument light. 
(4)  Connect the vacuum hoses at the rear of the instrument. 
(5)  Install the instrument panel cover.  Refer to Section 25-10. 

Doc # 6.02.01 Page 203
Rev. 4 09 Jan 2003

34-25-00
AMM

Intentionally left blank
34-25-00
Navigation
AMM

Section 34-28
Gyro-Compass System

1. General
This Section tells you about the gyro-compass system which can be installed in the DA 40. Refer to the manufacturer's manuals for more data about the equipment.
2. Description and Operation
The Bendix/King KCS 55A slaved remote-gyro-compass system (gyro-compass system) can be installed in the DA 40. The data from the gyro compass is supplied to the horizontal situation indicator (HSI). The gyro-compass system has these components:
) Slaved directional gyro KG 102A.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:钻石40飞机维护手册 DA 40 SERIES AMM 3(104)