(2)
The second task is the procedure to install the hinge assembly.
(3)
The third task is the procedure to remove and install the overhead stowage bin door.
(4)
The fourth task is the procedure to remove and install the latch assembly.
(5)
The fifth task is the procedure to open the overhead stowage bin door that does not operate.
(6)
The overhead stowage bin door is referred to as the door in this procedure.
TASK 25-28-01-002-001
2. Remove the Hinge Assembly_________________________
A. Access
(1) Location Zones
200 Upper Half of Fuselage
B. Procedure - Remove the Actuator (Fig. 201)
S 012-002
(1)
Open the overhead stowage bin door.
S 032-003
(2)
Hold the door and remove the bolts that attach each actuator chassis to the sidewall of the overhead stowage bin.
S 012-004
(3)
Remove the door with the actuator chassis.
S 032-005
(4)
Remove the pins that attach the actuator to the chassis and the hinge quadrant.
S 022-006
(5)
Remove the actuator.
C. Procedure - Remove the Hinge Quadrant (Fig. 201)
S 012-013
(1)
Open the overhead stowage bin door.
(2)
Remove the pin to disconnect the actuator from the hinge quadrant.
(3)
Hold the door and remove the bolt at the hinge point.
S 012-014
S 032-015
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-28-01
ALL ú ú 01 Page 201 ú Dec 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
DOOR
STRIKER
QUADRANT HINGE
A A
BOLT (3 LOCATIONS)
LATCH COVER SEE B HORIZONTAL TRIM STRIP ACTUATOR CHASSIS LATCH ASSEMBLY ASEE BULLNOSE ACTUATOR
SUPPORT BULLNOSE LATCH PAWL STRIKER
TUBE TORQUE DOOR
TUBE TORQUE LATCH COVER TRIM STRIP HORIZONTAL
LATCH ASSEMBLY
BRACKET A
Overhead Stowage Bin Door Figure 201 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-28-01
ALL ú ú 02 Page 202 ú Mar 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
OVERHEAD
LATCH COVER
Overhead Stowage Bin Door
Figure 201 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-28-01
ALL ú ú 01 Page 203 ú Mar 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
S 032-016
(4)
Remove the screws that attach the hinge quadrant to the door.
S 022-017
(5)
Remove the hinge quadrant.
TASK 25-28-01-402-043
3. Install the Hinge Assembly
__________________________
A. Access
(1) Location Zones
200 Upper Half of Fuselage
B. Procedure - Install the Actuator (Fig. 201)
NOTE: You must remove the actuator chassis and hinge quadrants from
____
the door before you can install the actuators.
S 412-007
(1)
Attach the actuators to the hinge quadrants and the actuator chassis with pins.
S 412-008
(2)
Install the actuator chassis on the sidewall of the overhead stowage bin. Tighten the bolts.
S 412-009
(3)
Install the screws to connect the door to the hinge quadrants.
(4)
Close the door. Make sure the strikers align with the latch covers.
S 822-044
(5)
Adjust the hinge quadrants to align the door, if it is necessary.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 1(77)