757
MAINTENANCE MANUAL
(8) S 824-014Push the blanket or capstrip on the studs.
(9) S 424-034Install the new disk fastener on the stud. Do not compress the blanket too much. Use stainless steel clips in place of the screw together pins for attaching insulation blankets to the frames.
S 824-025
(10)
Push the blanket or capstrip edges on the velcro tape.
S 414-016
(11)
Install the tape where it is necessary (Fig. 401).
S 414-020
(12)
For the sidewall insulation, install the overhead stowage bin.
S 414-021
(13)
For the sidewall insulation, install the sidewall panels (AMM 25-21-02/401).
S 414-022
(14)
For the ceiling insulation, install the sculptured ceiling panels (AMM 25-22-01/401).
S 414-023
(15)
For the ceiling insulation, install the lowered ceiling panels (AMM 25-22-02/401).
S 414-024
(16)
For the aft pressure bulkhead, install the aft galley G4B (AMM 25-31-04/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-21-05
ALL ú ú 01 Page 406 ú Jan 20/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
SIDEWALL INSULATION - APPROVED REPAIRS
______________________________________
TASK 25-21-05-308-021
1. Sidewall Insulation - Approved Repairs______________________________________
A. Procedure
S 308-022
(1) Refer to 25-00-00/801, Equipment/Furnishings - Approved Repairs, for the sidewall insulation.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-21-05
ALL ú ú 01 Page 801 ú Sep 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
DOORWAY LINING - REMOVAL/INSTALLATION
_____________________________________
1. General_______
A. This procedure contains these tasks.
(1)
The first task is the procedure to remove the left No. 1 doorway lining. The second task is the procedure to install the left No. 1 doorway lining.
(2)
The third task is the procedure to remove the right No. 1 doorway lining. The fourth task is the procedure to install the right No. 1 doorway lining.
(3)
The fifth task is the procedure to remove the No. 2 doorway lining. The sixth task is the procedure to install the No. 2 doorway lining.
(4)
The seventh task is the procedure to remove the No. 4 doorway lining. The eighth task is the procedure to install the No. 4 doorway lining.
B. In this procedure, the No. 1 doorway lining, the No. 2 doorway lining, and the No. 4 doorway lining are referred to as the doorway lining.
NOTE: On airplanes with Overwing Emergency Escape Hatch electric surface
____ heaters, care must be taken when removing the hatch doorway lining. The electric surface heaters are attached to the outboard surface of the trim, threshold, and center panel which are around the overwing exits.
TASK 25-21-06-004-001
2. Remove the Left No. 1 Doorway Lining (Fig. 401)____________________________________
A. References
(1)
AMM 33-51-00/201, Floor Proximity Emergency Lights.
(2)
AMM 33-51-01/201, Electrically Illuminated Exit Signs
B. Access
(1) Location Zone
831 No. 1 Passenger Door
C. Procedure
S 014-002
(1)
Open the left No. 1 passenger door.
(2)
Remove the acoustic seal from the doorway.
(3)
Remove the screws which are behind the acoustic seal.
(4)
Remove the trim strips (View A-A, Fig. 401).
(5)
Disconnect the service outlet.
S 024-136
S 024-137
S 024-138
S 024-139
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 1(49)