• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-11 09:23来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1)  
AIPC 33-51-07

 (2)  
SSM 33-51-01


 B.  Access
 (1)  Location Zone
 200 Upper Half of Fuselage

 C.  Lamp Replacement
 S 862-041
 (1)  Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  On the overhead circuit breaker panel, P7: 1) 7G14, CHG EMER LT
 S 962-028
 (2)  Do these steps to replace the lamp:
 (a)  
Remove the lens.

 (b)  
Carefully replace the lamp.

 (c)  
Install the lens.


 S 862-042
 (3) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  On the overhead circuit breaker panel, P7: 1) 7G14, CHG EMER LT
 D.  Lamp Test
 S 712-029
 CAUTION: KEEP THE OPERATION OF THE EMERGENCY LIGHTS TO LESS THAN A ONE
_______ MINUTE TIME. THE BATTERIES THAT SUPPLY THE ELECTRICAL POWER TO THE EMERGENCY LIGHTS WILL ONLY OPERATE FOR 15 MINUTES WHEN FULLY CHARGED.
 (1)  On the pilot's overhead panel, P5,
 set the EMER LIGHTS switch to the ON position.

 (a)  Make sure the new lamp comes on correctly.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-51-07
 ALL  ú ú 05 Page 201 ú Jun 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

ELECTRICAL

CEILING LIGHT
(EXAMPLE)

Ceiling Lights Installation
Figure 201

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-51-07
 ALL  ú ú 03 Page 202 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
E70604
A
747-400 MAINTENANCE MANUAL
 S 862-030
 (2)  Set the EMER LIGHTS switch to the OFF position.
 (a)  Make sure the emergency lights go off.
 TASK 33-51-07-002-009
 3.  Ceiling Light - Removal (Fig. 201)_______________________
 A. References
 (1)  
AIPC 33-51-07

 (2)  
SSM 33-51-01


 B. Access
 (1)  Location Zone
 200 Upper Half of Fuselage

 C. Light Assembly Removal
 S 862-043
 (1) Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  On the overhead circuit breaker panel, P7: 1) 7G14, CHG EMER LT
 S 862-035
 (2)  Do these steps to remove the light:
 (a)  
Open the ceiling panel to get access to the light assembly.

 (b)  
Disconnect the electrical connectors.

 (c)  
Remove the screws and remove the light assembly.


 TASK 33-51-07-402-015
 4.  Ceiling Light - Installation (Fig. 201)____________________________
 A. References
 (1)  
AIPC 33-51-07

 (2)  
SSM 33-51-01


 B. Access
 (1)  Location Zone
 200 Upper Half of Fuselage

 C. Procedure
 S 422-039
 (1)  Do these steps to install the light:
 (a)  
Install the light assembly with its screws.

 (b)  
Connect the electrical connectors.

 (c)  
Close the ceiling panel.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 33-51-07
 ALL  ú ú 03 Page 203 ú Jun 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 862-044
 (2) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  On the overhead circuit breaker panel, P7:
 1) 7G14, CHG EMER LT

 D. Light Test
 S 712-031
 CAUTION: KEEP THE OPERATION OF THE EMERGENCY LIGHTS TO LESS THAN A ONE
_______ MINUTE TIME. THE BATTERIES THAT SUPPLY THE ELECTRICAL POWER TO THE EMERGENCY LIGHTS WILL ONLY OPERATE FOR 15 MINUTES WHEN FULLY CHARGED.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 灯 LIGHTS(144)