 Put a radius washer (27) on the lockbolt (28) and the lockbolt (30).

 (3)
 Install the smaller diameter lockbolt (28) through the forward pintle pin (31) outboard lug into the forward pintle.

 (4)
 Install the lockbolt (30) through the forward pintle pin (31) inboard lug into the forward pintle.

 (5)
 Install the nylon washers (33), the spacers (34) and the nuts (35) on the lockbolt (28) and the lockbolt (30). Do not install the laminated shims (32).


R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 32-11-11Page 459 1301-399, 1Aug 01/05 1 1 1CES 1


 (6) Make sure that the radius washers (27) are installed correctly
 against the internal contour of the forward pintle pin (31).

 NOTE : The components must be installed in the same position
____
 identified in the removal procedure.

 (7)
 TORQUE the nuts (35) to 0.50 m.daN (44.24 lbf.in).

 (8)
 Make sure that the radius washers (27) have not moved.

 (9)
 At position A or B, use a feeler gage to measure and record the end float on the lockbolt (28) or the lockbolt (30).


 (10)
 Adjust the new laminated shims (32) to the dimension of the recorded end float of the lockbolt (28) and/or the lockbolt (30).

 (11)
 Make sure that:

 -no more shim laminates are removed than are necessary
 -the adjusted shim pack dimension is not less than the recorded end float.

 (12)
 Remove the nuts (35), the spacers (34) and the nylon washers (33).

 (13)
 Install the new laminated shims (32), the nylon washers (33), the spacers (34) and the nuts (35) on the lockbolt (28) and the lockbolt (30).

 (14)
 Make sure that the radius washers (27) are installed correctly against the internal contour of the forward pintle pin (31).

 (15)
 TORQUE the nuts (35) to 0.50 m.daN (44.24 lbf.in).

 (16)
 Make sure that the radius washers (27) have not moved.

 (17)
 Safety the nuts (35) with new cotter pins (36). If the holes for the cotter pins do not align, tighten the nuts (35) sufficiently to align the holes.

 (18)
 Apply SEALANTS (Material No. 09-016) to the lockbolt (28), the lockbolt (30), the spacers (34), the nylon washers (33), the laminated shims (32), the nuts (35) and the cotter pins (36).


 NOTE : Apply the sealant after you assemble the components, over the
____
 external surfaces only.

 (19) Apply a layer of STRUCTURE PAINTS (Material No. 16-021) or STRUCTURE PAINTS (Material No. 16-016) on all the sealant.
R 1EFF : 301-399, 1 32-11-11Page 460 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 062-099, 101-149, 151-199, 201-299, 401-499,

 

 Post SB 32-1213 For A/C 001-049,101-105,201-203,
 Subtask 32-11-11-420-056-A
 E. Installation of the MLG Leg Assembly
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (1)
 Put a radius washer (28) on each lockbolt (29). Install the lockbolts

 (29) through the forward pintle pin (27) lugs into the forward pintle.

 (2)
 Install the nylon washers (31), the spacers (32) and the nuts (33) on the applicable lockbolts (29). Do not install the laminated shims (30).

 (3)
 Make sure that the radius washers (28) are installed correctly against the internal contour of the pintle pin (27).


 NOTE : The components must be installed in the same position
____
 identified in the removal procedure.

 (4)
 TORQUE the nuts (33) to 0.50 m.daN (44.24 lbf.in).

 (5)
 Make sure that the radius washers (28) have not moved.

 (6)
 Use a feeler gage to measure and record the end float of the lockbolts (29) at positions A and C.


 NOTE : If access to positions A and C is not possible, the end float
____ can be measured at positions B and D.
 (7)
 Remove the nuts (33), the spacers (32) and the nylon washers (31) from the applicable lockbolt(s) (29).

 (8)
 Adjust the new laminated shims (30) to the dimension of the recorded end float of the applicable lockbolt (29).


R 1EFF : 001-049, 062-099, 101-149, 151-199, 1 32-11-11Page 461 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 