R **ON A/C 051-099, 201-210,
23-33-12-991-001 Fig. 401 R **ON A/C 106-149, 211-299,
23-33-12-991-001-A Fig. 401A
**ON A/C 301-399,
23-33-12-991-001-B Fig. 401B
R 1EFF : 051-099, 106-149, 201-299, 301-399, 1 23-33-12Page 409 1 1 May 01/05 1 1 1CES 1
R **ON A/C 051-099, 106-149, 201-299, 301-399,
3. Job Set-up__________
R **ON A/C 051-099,
R Subtask 23-33-12-865-051-C
R R A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
R R R R -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D01
R **ON A/C 106-149, 211-299,
Subtask 23-33-12-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D01 2000VU PES/MUSIC/CABIN/LH 23MK D02 2000VU PES/MUSIC/CABIN/RH 24MK D03
R **ON A/C 201-210,
R Subtask 23-33-12-865-051
R A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
R R R R R R -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D01 2000VU PES/MUSIC/LH 23MK D02 2000VU PES/MUSIC/RH 24MK D03
R 1EFF : 051-099, 106-149, 201-299, 301-399, 1 23-33-12Page 410 1 1 May 01/05 1 1 1CES 1
**ON A/C 301-399,
Subtask 23-33-12-865-051-B
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU PES/MUSIC/CTL 21MK D01 2000VU PES/MUSIC/CABIN AFT/LH 22MK D04 2000VU PES/MUSIC/CABIN FWD/LH 23MK D02 2000VU PES/MUSIC/CABIN FWD/RH 24MK D03 2000VU PES/MUSIC/CABIN AFT/RH 25MK D05
R **ON A/C 051-099, 106-149, 201-299, 301-399,
4. Procedure_________
R **ON A/C 051-099, 201-210,
(Ref. Fig. 401/TASK 23-33-12-991-001)
R **ON A/C 106-149, 211-299,
(Ref. Fig. 401A/TASK 23-33-12-991-001-A)
**ON A/C 301-399,
(Ref. Fig. 401B/TASK 23-33-12-991-001-B)
R **ON A/C 051-099,
R Subtask 23-33-12-420-052-B
R A. Installation of the Passenger Control Unit (PCU)
R (1) Clean the component interface and/or the adjacent area.
R (2) Do an inspection of the component interface and/or the adjacent area.
R 1EFF : 051-099, 106-149, 201-299, 301-399, 1 23-33-12Page 411 1 1 May 01/05 1 1 1CES 1
R (3) Remove the blanking caps from the electrical connectors.
R R (4) Make sure that the electrical connectors are clean and in the correct condition.
R R (5) Connect the cable connector (3) to the related electrical connector inside the armrest.
R (6) Carefully put the PCU (1) in the correct position.
R (7) Install the PCU (1) with the screw (2).
R **ON A/C 106-149, 211-299, 301-399,
Subtask 23-33-12-420-052-A
A. Installation of the Passenger Control Unit (PCU)
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Remove the blanking caps from the electrical connectors.
(4) Make sure that the electrical connectors are clean and in the correct condition.
(5) Connect the electrical connector(s) (4).
(6) Carefully install the PCU (1) on the seat armrest and make sure that the notch (5) is correctly engaged.
(7) Turn the captive screw (3) a quarter clockwise to lock the hook (2).
R **ON A/C 201-210,
R Subtask 23-33-12-420-052
R A. Installation of the Passenger Control Unit (PCU)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯2(9)