 b32 b31 b30 b23 b16 b15 b14 b13 b12 b11 b10 b9 b8 b1 -------------------------------------------------------------------------------| | |M |A |H |H |V | | | | P | 0 0 |0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0| L | D | F | F | H | 0 | 0|LABEL| | | | S| F | 2| 1| F | | | 350 | | | | | 2| | | 3| | | | -------------------------------------------------------------------------------
-
Bit at logic 0: the equipment is not installed

 -
Bit at logic 1: the equipment is installed


 (b) Transmission of identification message Every component connected to the maintenance centralized system transmits an identification message to facilitate and shorten the test procedures. The identification code assigned to the AMU is 6A. This information is transmitted in 32-bit word form in compliance with ARINC 429 with label 377. Word structure is as follows:
 b31 b30 b29 b19 b18 b15 b14 b11 b10 b9 b8 b1 -------------------------------------------------------------------------------| | | | | | | | | | P | 0 0 | 0 0 0 0 0 0 0 0 0 0 0 | 6 | A | 0 | 1 | LABEL 377 | | | | | | | | | | -------------------------------------------------------------------------------
**ON A/C ALL
 F. Power-up Tests Initialization and Cockpit Repercussions
 (1) Conditions of power-up tests initialization
 -How long the computer must be de-energized: 1 s.
 -A/C configuration:
 . Whatever the A/C configuration on ground

R 1EFF : ALL 1 23-51-00Page A18 1 1 May 01/05 1 1 1CES 1


 (2)
 Progress of power-up tests

 -Duration: 1 s.
 -Cockpit repercussions directly linked to power-up test accomplishment (some other repercussions may occur depending on the A/C configuration but these can be disregarded):
 -None

 (3)
 Results of power-up tests (cockpit repercussions, if any, in case of tests pass/tests failed).

 -
Tests pass:
 . None


 -
Tests failed:
 . None

 

 

 1EFF : ALL 1 23-51-00Page A19 1 1 May 01/05R 1 1 1CES 1


 AUDIO MANAGEMENT (INTEGRATING/ FLIGHT INTERPHONE/SELCAL/CALL)
_____________________________________________________________ DEACTIVATION/REACTIVATION
_________________________
 TASK 23-51-00-040-001
 Deactivation of the Radio PTT Switch (11RN, 12RN)
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
 MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
 DAMAGE.

 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 23-51-08
 Communications
 Side Stick Radio selector

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific end caps
 No specific warning notice

R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 27-96-00-710-003 Operational Test of the Side Stick Priority 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
 Power Supply
 29-10-00-864-003 Depressurize the Blue Hydraulic System

 1EFF : ALL 1 23-51-00Page 401 1 1 May 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


29-23-00-863-001  Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
 29-23-00-864-001 Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU 29-24-00-863-001 Pressurize the Yellow Hydraulic System with the
 Electric Pump
 29-24-00-864-001 Depressurize the Yellow Hydraulic System
 31-60-00-860-001 EIS Start Procedure
 31-60-00-860-002 EIS Stop Procedure
 34-10-00-860-004 IR Alignment Procedure

R ESPM 204213 R 23-51-00-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 23-51-00-865-055
 A. Open, safety and tag this(these) circuit breaker(s):
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯2(127)