• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-20 21:11来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

23-36-00-600-002 23-36-00-710-001 23-73-00-861-001 23-73-00-862-001  Configuration of the Passenger Entertainment (Video) with the Programmable System Control UnitOperational Test of the Passenger Entertainment (Video)Energize the Cabin Intercommunication Data System (CIDS)De-energize the Cabin Intercommunication Data System (CIDS) 
R  **ON A/C 051-099, 151-199, 201-210,
 23-36-34-991-001  Fig. 401 
R  **ON A/C 106-149, 211-299, 301-399,
 23-36-34-991-001-A  Fig. 401A 

R 1EFF : 051-099, 106-149, 151-199, 201-299, 1 23-36-34Page 407 1301-399, 1May 01/05 1 1 1CES 1


R  **ON A/C 051-099, 106-149, 151-199, 201-299, 301-399,
 3. Job Set-up__________ 
R  **ON A/C 051-099, 
R  Subtask 23-36-34-865-051-C 
R R  A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged 
R R R R R R  ------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION ------------------------------------------------------------------------------2000VU PES/VIDEO/CTL 21MH 01 C 2000VU PES/VIDEO/CABIN/LH 22MH 02 C 2000VU PES/VIDEO/CABIN/RH 23MH 03 C 
R  **ON A/C 106-149, 211-299,
 Subtask 23-36-34-865-051-A
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 ------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION ------------------------------------------------------------------------------2000VU PES/VIDEO/CONTROL/MAIN 20MH 01 C 2000VU PES/VIDEO/CONTROL/VCC 21MH 02 C 2000VU PES/VIDEO/CABIN/LH 22MH 03 C 2000VU PES/VIDEO/CABIN/RH 24MH 04 C 

R 1EFF : 051-099, 106-149, 151-199, 201-299, 1 23-36-34Page 408 1301-399, 1May 01/05 1 1 1CES 1


R  **ON A/C 151-199, 201-210, 
R  Subtask 23-36-34-865-051 
R  A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged 
R R R R R R R  ------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION ------------------------------------------------------------------------------2000VU PES/VIDEO/VCC CTL 20MH 01 C 2000VU PES/VIDEO/VCC CTL 21MH 02 C 2000VU PES/VIDEO/CABIN/LH 22MH 03 C 2000VU PES/VIDEO/CABIN/RH 24MH 04 C
 **ON A/C 301-399,
 Subtask 23-36-34-865-051-B
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 ------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION ------------------------------------------------------------------------------2000VU PES/VIDEO/CONTROL/MAIN 20MH 01 C 2000VU PES/VIDEO/CONTROL/VCC 21MH 02 C 2000VU PES/VIDEO/CABIN FWD/LH 22MH 03 C 2000VU PES/VIDEO/CABIN FWD/RH 24MH 04 C 2000VU PES/VIDEO/CABIN AFT/LH 23MH 05 C 2000VU PES/VIDEO/CABIN AFT/RH 25MH 06 C 
R  **ON A/C 051-099, 106-149, 151-199, 201-299, 301-399,
 4. Procedure_________ 
R  **ON A/C 051-099, 151-199, 201-210,
 (Ref. Fig. 401/TASK 23-36-34-991-001) 

R 1EFF : 051-099, 106-149, 151-199, 201-299, 1 23-36-34Page 409 1301-399, 1May 01/05 1 1 1CES 1R **ON A/C 106-149, 211-299, 301-399,

 

 (Ref. Fig. 401A/TASK 23-36-34-991-001-A) R **ON A/C 051-099, 151-199, 201-210,
 Subtask 23-36-34-420-050
 A. Installation of the System Control Unit (SCU)
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the blanking caps from the electrical connectors.

 (4)
 Make sure that the electrical connectors are clean and in the correct condition.

 (5)
 Carefully install the SCU (1) into the rack. Make sure that the SCU is correctly aligned to prevent damage to the electrical connectors.

 (6)
 Lift the fasteners and tighten the knurled nuts (2) until the SCU (1) is correctly attached.

 

R **ON A/C 106-149, 211-299, 301-399,
 Subtask 23-36-34-420-050-A
 A. Installation of the System Control Unit (SCU)
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Install the SCU (3) on the adaptor plate (4) with the screws (7).

 (4)
 Carefully lift the adaptor plate (4) together with the SCU (3) into the overhead stowage compartment in front of the the video control center and move the adaptor plate (4) together with the SCU (3) into the rack (1).

 (5)
 Tighten the knurled screws (2).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯2(82)