(5)
Install the IFE CENTER (5) in its rack (2).
(6)
Push the IFE CENTER (5) on its rack (2) to connect the electrical connectors (1).
(7) Engage the nuts (3) on the lugs (4) and tighten. Subtask 23-33-36-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 7XN2
Subtask 23-33-36-740-050
C. Do the BITE test of the IFE CENTER (Ref. TASK 23-33-00-740-002).
1EFF : ALL 1 23-33-36Page 405 1 1 Feb 01/03 1 1 1CES 1
5. Close-up
________ Subtask 23-33-36-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access door 824 (Ref. TASK 52-41-00-410-002).
(3)
Remove the access platform(s).
1EFF : ALL 1 23-33-36Page 406 1 1 Feb 01/03 1 1 1CES 1
CONTROLLER - IFE - REMOVAL/INSTALLATION
_______________________________________ TASK 23-33-37-000-001 Removal of the CONTROLLER - IFE (311MK)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
23-33-37-991-001 Fig. 401
3. Job Set-up
__________ Subtask 23-33-37-865-050
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
123VU BUS 2/210XP/SPLY 7XN2 AF02
1EFF : ALL 1 23-33-37Page 401 1 1 Feb 01/03 1 1 1CES 1 Subtask 23-33-37-010-050
B. Get Access
(1)
Put the access platform in position at the access door 824 in zone
128.
(2)
Open the access door 824.
4. Procedure
_________
(Ref. Fig. 401/TASK 23-33-37-991-001) Subtask 23-33-37-020-050
A. Removal of the CONTROLLER - IFE
(1)
Loosen the nuts (3).
(2)
Lower the nuts (3).
(3)
Pull the CONTROLLER - IFE (5) on its rack (2) to disconnect the electrical connectors (1).
(4)
Remove the CONTROLLER - IFE (5) from its rack (2).
(5)
Put blanking caps on the disconnected electrical connectors (1).
1EFF : ALL 1 23-33-37Page 402 1 1 Feb 01/03 1 1 1CES 1
CONTROLLER - IFE
Figure 401/TASK 23-33-37-991-001
1EFF : ALL 1 23-33-37 Page 403
1 1 Feb 01/03
1 1
1CES 1
TASK 23-33-37-400-001
Installation of the CONTROLLER - IFE (311MK)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
23-33-00-740-002 BITE-Test of the Passenger Entertainment System
(Music) with the Programming and Test Panel (PTP) 52-41-00-410-002 Close the Avionics Compartment Doors after Access 23-33-37-991-001 Fig. 401
3. Job Set-up
__________ Subtask 23-33-37-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the access platform is in position at the access door 824 in zone 128.
(2)
Make sure that the access door 824 is open.
1EFF : ALL 1 23-33-37Page 404 1 1 Feb 01/03 1 1 1CES 1 Subtask 23-33-37-865-052
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯2(13)