曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
stamp against the parts list. Mismatched component parts
are among the most frequent problems found in the field.
Many riggers are under the impression they can freely
interchange component parts, but this may be done only
within certain limits. Paragraph 11(a) of Advisory
Circular (AC) 105-2C, Sport Parachute Jumping, states:
“The assembly or mating of approved parachute components
from different manufacturers may be made by a certificated
and appropriately rated parachute rigger or
parachute loft in accordance with the parachute manufacturer’s
instructions and without further authorization by
the manufacturer or the FAA. Specifically, when various
parachute components are interchanged, the parachute
rigger should follow the canopy manufacturer’s instructions
as well as the parachute container manufacturer’s
instructions. However, the container manufacturer’s
instructions take precedence when there is a conflict
between the two.” In figure 5-2, note the bold print at the
bottom of the page: “NO SUBSTITUTION OF COMPONENT
PARTS IS AUTHORIZED!” This manufacturer
specifically states that you cannot use anything other than
Original Equipment Manufacturer (OEM) parts.
Substituting other parts places the rigger in violation of
the Code of Federal Regulations.
A common problem found in the field concerns reserve
ripcords. Several manufacturers of sport rigs use a onepin
ripcord with a mini trapezoidal handle and a cable
length 27-29 inches long. Depending on the actual container
it goes into, it’s possible to use one manufacturer’s
ripcord in another container as long as the rigger feels
there is sufficient excess cable for safety reasons.
However, imagine one ripcord is 27 inches overall and is
used in a system that is approved under Technical
Standard Order (TSO) C-23b and is rated at 300 pounds.
Figure 5-2. Sample parts list.
Another ripcord is 28 inches overall and is used in a
system approved under TSO C-23c, and is rated at 600
pounds for use with a Reserve Static Line (RSL) installation.
The problem here is the mating of different TSO
standard components. Installing the first ripcord in the
second container with an RSL lanyard may be degrading
the safety aspect of the system. So how does the rigger
tell which is which? The ripcord approved under
TSO C-23b will have minimal markings, perhaps only a
manufacturer’s part number. The ripcord approved
under TSO C-23c will have several markings on the handle
as required by the TSO. It should have the manufacturer’s
part number, manufacturer’s identification,
TSO-C23c, and the batch or serial number or date of
manufacture. [Figure 5-3] In reality, as long as the cable
lengths are compatible, the function of the ripcord will
probably work. The problem surfaces in the event of a
problem or incident involving the system. At this point,
the FAA could find the mismatched component and take
action against the rigger who packed the parachute.
Figure 5-3. Reserve ripcord with TSO markings.
A bigger problem surfaces when the rigger substitutes a
reserve deployment bag made by another manufacturer.
Most reserve deployment bags are compatible with the
appropriate container based on dimensions and volume.
If the deployment bag does not fit correctly, there can be
a problem with proper functioning of the system. These
are two examples of the more common compatibility
issues that are regularly found in the field. There are others
that the rigger may encounter and need to address as
well. The best solution is for the rigger to follow the manufacturer’s
parts list strictly to ensure the safety of the
parachute system.
After the rigger has determined that all of the component
parts are compatible, he/she can now commence the
actual inspection of the parachute assembly. Figure 5-4
shows a typical pilot emergency parachute assembly with
a round canopy laid out on the packing table. Make sure
the canopy is straight and the apex lines are even. Then
apply firm tension to the canopy and lines using a tension
board. The standard is to start at the top of the assembly.
This assembly in figure 5-4 can be broken down into six
separate areas. They are:
1. Pilot chute and bridle.
2. Canopy and deployment device.
3. Suspension lines and connector links.
4. Container.
5. Harness including risers.
6. Ripcord.
Inspection/packing checklists allow riggers to track their
progress as they do their inspection. [Figure 5-5] It is
desirable for riggers to complete their inspection uninterrupted,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
Parachute Rigger Handbook(41)