• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-21 11:48来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

c) If required, add oil.
3) Fill charging cylinder
a) Remove blanking caps.
AAAA
Validity : Vapor cycle cooling system - KEITH 12-15-01Page 301
(BA) JUN 02
 
b) Connect refrigerant (TB 05-922) drum to the red high pressure (HP) hose of the charging cart.
c) Make sure that the "VAC" and "LOW" hand valves of the charging cart are closed.
d) Open the refrigerant drum hand valve and then, slowly, the charging cart "HIGH" and "REF" hand valves.
e) When the refrigerant stops flowing into the charging cylinder, close the "REF" hand valve.
f) Read pressure on the cylinder pressure gage.
g) Rotate the cylinder sight glass until the pressure value is in line with the red column.
h) Open "REF" hand valve.
i) Pull on purging valve located on cylinder head to drop the pressure and transfer 3.31 lbs (1.5 kg) of refrigerant.
NOTE : The refrigerant weight should be 1.5 time the weight of the charge required in the system.
j) Close "REF", "HIGH" and refrigerant drum hand valves.
k) Disconnect the refrigerant drum and install the blanking caps.
4) For the first charging or following a serious leak, carry out following operations
a) Connect the fluoro-dye injector on the charging cart "LOW" fitting.
b) Connect the oil injector on the fluoro-dye injector.
c) Connect blue low pressure (LP) hose to oil injector.
d) Make sure that fluoro-dye injector hand valve is open.
e) Make sure that oil injector by-pass tee hand valve is closed.
5) Remove baggage compartment bottom door 242.
6) Remove blanking caps from system service valves in the rear fuselage.
7) Connect the blue LP hose to the LP service valve.
NOTE : Wipe water off from the hose fitting with a lint-free clean cloth.
8) Connect the red HP hose to the HP service valve.
NOTE : Wipe water off from the hose fitting with a lint-free clean cloth.
CAUTION : AIR IN THE SYSTEM CREATES A CHEMICAL REACTION AFFECTING MATERIALS AND REDUCES CONDENSER PERFORMANCE.
9) Start vacuum pump.
10) Open "VAC", "LOW" and "HIGH" hand valves and draw vacuum for approximately 30 minutes.
11) Close "VAC" hand valve, stop vacuum pump and hold vacuum for approximately 10 minutes.
12) Check low and high pressure gages and verify that the system is holding a vacuum.
13) If the system is airtight, close "LOW" and "HIGH" hand valves.
WAWA
Validity : Vapor cycle cooling system - KEITH 12-15-01Page 302
(BA) JUN 02
 
14) If the pressure rises, leak in the system, carry out following steps
a) Check tightening of charging cart hoses and accessories and retighten as necessary.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 12 SERVICING TB20飞机维护手册 12 保养(45)