Page 208 Doc # 6.02.01 09 Jan 2003 Rev. 4
25-60-00
Equipment/Furnishings
5. Remove/Install the RCPI
% This paragraph is valid for the ACK E-01 ELT only.
A. Remove the RCPI
Detail Steps/Work Items Key Items/References
(1) Remove the instrument panel cover. Refer to Section 25-10.
(2) Disconnect the electrical cable from the rear of the RCPI. At the in-line connector.
(3) Remove the 4 screws which attach the RCPI to the instrument panel.
(4) Move the RCPI forward and clear of the airplane.
B. Install the RCPI
Detail Steps/Work Items Key Items/References
(1) Move the RCPI into position in the instrument panel.
(2) Install the 4 screws which attach the RCPI to the instrument panel.
(3) Connect the electrical cable to the rear of the RCPI. At the in-line connector.
(4) Install the instrument panel cover. Refer to Section 25-10.
(5) Do a functional test of the ELT system. Refer to Paragraph 3.
Doc # 6.02.01 Page 209
Rev. 4 09 Jan 2003
25-60-00
AMM
6. Replace the RCPI Battery
% This paragraph is valid for the ACK E-01 ELT only.
DA 40 Series
Detail Steps/Work Items Key Items/References
(1) Remove the RCPI from the airplane. Refer to Paragraph 5.
(2) Remove the 3 screws which attach the top and bottom halves of the RCPI. Refer to Figure 4.
(3) Loosen the 2 switch attaching nuts from the front of the RCPI.
(4) Carefully remove the top half of the RCPI. You will see the battery compartment. Remove the battery.
(5) Examine the battery contacts. Use a stiff brush and an electrical contact cleaner to carefully remove ant dirt or corrosion from the contacts.
CAUTION: DO NOT USE ABRASIVE CLEANERS. THE CONTACTS ARE NICKEL AND GOLD PLATED SPRING STEEL. AN ABRASIVE CLEANER WILL REMOVE THIS PLATING AND DAMAGE THE CONTACTS.
(6) If the contacts are badly corroded, replace them.
(7) Insert the battery into the battery compartment.
(8) Install the top half of the RCPI onto the bottom half of the RCPI.
(9) Install the 3 retaining screws.
(10) Tighten the 2 switch retaining nuts.
(11) Install the RCPI into the airplane. Refer to Paragraph 5.
(12) Record the date when the RCPI battery is next due replacement on a self adhesive which is supplied with the ELT.
(13) Attach the self adhesive label to the ELT where it can easily seen.
(14) Do a functional test of the ELT. Refer to Paragraph 3.
Page 210 Doc # 6.02.01 09 Jan 2003 Rev. 4
25-60-00
DA 40 Series
Equipment/Furnishings
7. ELT Periodic Inspection
The ELT installation must be inspected at least once every 12 months to maintain serviceability.
% A. ACK E-01