Page 202 Doc # 6.02.01 09 Jan 2003 Rev. 4
24-61-00 
DA 40 Series 
Electrical Power 
AMM
% 4. Remove/Install a Circuit-Breaker 
% 
% 
% 
%
%
% 
% 
% 
%
%
% 
% 
% 
%
%
% 
% 
% 
%
% 
% 
%
% A. Remove a Circuit-Breaker %
Detail Steps/Work Items  Key Items/References  
(1)  Remove the top engine cowling.  Refer to Section 71-11.  
(2)  Disconnect the main battery: S Disconnect the negative cable from the battery. S Disconnect the positive cable from the battery.  Refer to Section 24-34.  
(3)  Disconnect the ECU backup battery: S Disconnect the negative cable from the battery. S Disconnect the positive cable from the battery.  Refer to Section 24-34.  
(4)  Remove the instrument panel cover.  Refer to Section 25-10.  
(5)  Remove the nuts and washers which attach the circuit-breakers to the instrument panel.  Do this for all circuit-breakers attached to the same bus bar.  
(5)  Remove the screw which connects the circuit-breaker to the copper bus bar.  
(7)  Disconnect the wires from the circuit-breaker.  
(8)  Shift back the copper bus bar together with the remaining circuit-breakers.  
(9)  Remove the circuit-breaker from the instrument panel. 
%
Doc # 6.02.01 Page 203 
Rev. 4 09 Jan 2003
24-61-00 
DA 40 Series
AMM
%
% 
% 
%
%
% 
% 
%
%
% 
% 
% 
%
% 
% 
% 
% 
% 
%
%
% 
% 
%
%
%
% 
%
% B. Install a Circuit-Breaker %
Detail Steps/Work Items  Key Items/References  
(1)  Put the circuit-breaker in position in the instrument panel.  
(2)  Move the copper bus bar forward together with the remaining circuit-breakers.  
(3)  Connect the wires to the circuit breaker.  Refer to Chapter 92 for the Wiring Diagrams.  
(4)  Install the screw which attaches the circuit-breaker to the copper bus bar.  
(5)  Install the nuts and washers which attach the circuit-breakers to the instrument panel.  
(6)  Install the instrument panel cover.  Refer to Section 25-10.  
(7)  Connect the main battery.  Refer to Section 24-34. Connect the positive cable first.  
(8)  Connect the ECU backup battery.  Refer to Section 24-34. Connect the positive cable first.  
(9)  Install the top engine cowling.  Refer to Section 71-11.  
(10)  Do a functional test of the circuit-breaker: S Set the ELECTRIC MASTER key switch to ON. S Operate the electrical system related to the circuit-breaker you will test. S Pull the circuit-breaker. S Close the circuit-breaker. S Set the ELECTRIC MASTER key switch to OFF.  Apply the full electrical load to the system. The system must stop operating. Make sure there is no power to the system. 
%
Page 204 Doc # 6.02.01 09 Jan 2003 Rev. 4
24-61-00 
Electrical Power 
AMM
% 5. Remove /Install an Instrument Panel Switch 
% This procedure applies to the following switches: 
%) PITOT. 
%) LANDING, TAXI, POSITION and STROBE lights. 
%) ESS. BUS. 
%) AVIONIC MASTER. 
%) FUEL TRANS .. 
% 
% A. Remove an Instrument Panel Switch
% 
%
%
%
% 
%
% 
%
%
% 
%
%
% 
% 
%
% 
%
Detail Steps/Work Items  Key Items/References  
(1)  Remove the top engine cowling.  Refer to Section 71-11.  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:钻石40飞机维护手册 DA 40 SERIES AMM 2(73)