(d)  
If access is not necessary for subsequent tasks, install access panel No. 5   (AMM 28-11-11/401).

 

(6)  
For the area in the No. 1 fuel tank between rib No. 10 (rib at WBL 279.25) and rib No. 11 (rib at WBL 304.50), do these steps:

(a)  
Remove access panel No. 6 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 6 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 10 and rib No. 11: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 6   (AMM 28-11-11/401).

 

(7)  
For the area in the No. 1 fuel tank between rib No. 11 (rib at WBL 304.50) and rib No. 12 (rib at WBL 329.75), do these steps:

(a)  
Remove access panel No. 7 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 7 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 11 and rib No. 12: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 7   (AMM 28-11-11/401).

 

(8)  
For the area in the No. 1 fuel tank between rib No. 12 (rib at WBL 329.75) and rib No. 13 (rib at WBL 355.00), do these steps:

(a)  
Remove access panel No. 8 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 8 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 12 and rib No. 13: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 8   (AMM 28-11-11/401).

 


500 28-00    Sep 01/02 Page 204

(9)  
For the area in the No. 1 fuel tank between rib No. 13 (rib at WBL 355.00) and rib No. 14 (rib at WS 453.00), do these steps:

(a)  
Remove access panel No. 9 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 9 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 13 and rib No. 14: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 9   (AMM 28-11-11/401).

 

(10)
For the area in the No. 1 fuel tank between rib No. 14 (rib at WS 453.00) and rib No. 15 (rib at WS 479.00), do these steps:

(a)  
Remove access panel No. 10 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 10 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 14 and rib No. 15: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 10   (AMM 28-11-11/401).

 

(11)
For the area in the No. 1 fuel tank between rib No. 15 (rib at WS 479.00) and rib No. 16 (rib at WS 505.00), do these steps:

(a)  
Remove access panel No. 11 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 11 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 15 and rib No. 16: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 11   (AMM 28-11-11/401).

 

(12)
For the area in the No. 1 fuel tank between rib No. 16 (rib at WS 505.00) and rib No. 17 (rib at WS 531.00), do these steps:

(a)  
Remove access panel No. 12 on the left wing (AMM 28-11-11/401).

(b)  
Go into the opening for access panel No. 12 (AMM 28-10-0/201).

(c)  
Do this task for all bonding jumpers between rib No. 16 and rib No. 17: Inspection of the Electrical Bonding Jumpers in the Fuel System. 1) Refer to drawing 65-48405 for bonding jumper locations.

(d)  
If access is not necessary for subsequent tasks, install access panel No. 12   (AMM 28-11-11/401).

 


500
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 燃油 FUEL(8)