• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-30 10:38来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

B.  Thoroughly clean O-ring groove and mounting surface of relief valve and valve mounting surfaces on access panel using clean, lint-free cloth moistened with naphtha.
C.  Install O-ring seal, lightly lubricated with fuel, in groove on relief valve flange.
D.  Position relief valve on access panel and install eight mounting screws. Tighten the mounting screws evenly to a standard value of 30-35 in/lb.
E.  Install access panel on airplane (Ref 28-11-11 R/I).
F.  If valve is open, use manual reset knob (or T-handle) to close valve poppet (Ref 28-13-41 I/C).
G.  Check relief valve actuation (Ref 28-13-41 I/C).
H.  If no longer required, remove precautionary signs and return airplane to normal.
533 
28-13-41 Page 404  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  May 01/01 


SURGE TANK FLAME ARRESTOR PRESSURE RELIEF VALVE -INSPECTION CHECK

EFFECTIVITY
AIRPLANES POST-SB 28-1026 or POST-SB 28-1131
1. General
A.  The relief valve, if actuated to the open position, will bypass the normal air vent scoop in the fuel vent system. Once open, from an abnormal positive or negative pressure differential, the valve must be manually closed. The actuation pressure check is made with the valve installed in the airplane, using special equipment attached to the external skin of the airplane.
2.  Close the Relief Valve Using Manual Reset
A.  Check for open relief valve by examining poppet position at center of elliptical access panel adjacent to air vent scoop at each wing tip.
NOTE:  An open valve will have poppet positioned above the wing lower skin surface with the manual reset knob (or T-handle) and stem protruding down below poppet.
B.  Manually reset relief valve poppet to closed position (Fig. 601).
(1)  
Grasp manual reset knob (or T-handle) and pull downward until outer face of poppet is flush with skin.

(2)  
Relax downward pull gradually to ensure poppet is latched in closed position then continue to relax pull gradually until return spring retracts reset knob (or T-handle) into recess.


NOTE:  Outer face of reset knob (or T-handle) and poppet should all be flush with wing lower skin in final closed position.
3.  Relief Valve Actuation Pressure Check (Fig. 602)
A.  Equipment and Materials
(1)  
Test Fixture, Pressure Relief Valve -F80166-1

(2)  
Leak Tracing Device -F71329

(3)  
Pressure monitoring device -0-5 psig (0-138 inches of water/0-34.5 kPa) Use one of these or equivalent:

(a)  
Water Safety Relief Manometer -F72951-1 (recommended)

(b) 
 DigiMano 2000
Available from:
Netech Corporation
60 Bethpage Drive
Hicksville, NY 11801, USA

 


(4)  
Air supply - 0-10 psig (0-68.9 kPa)


B.  Prepare for Pressure Check
(1)  Make sure the relief valve is in the closed position. Manually reset to the closed position, if open (Ref par. 2.).
May 01/03 28-13-41 Page 601
B
O
E
I
NG
P
R
OP
R
I
E
T
A
R
Y
 - Copyri
ght
 . - Unpubl
i
s
hed
W
o
r
k
 -
S
ee
t
i
t
l
e page f
o
r de
t
a
i
l
s
.

 

K08117 K15531
Surge Tank Flame Arrestor Pressure Relief Valve Manual Reset  533 
28-13-41  Figure 601  May 01/01 
Page 602 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


533  Surge Tank Flame Arrestor Pressure Relief Valve  
May 01/99  Actuation Pressure Check  28-13-41 
 Figure 602  Page 603 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


(2)  Install the F80166 test fixture on the relief valve.
(a)  
Remove, at 90-degree intervals, four of the eight mounting screws that attach the relief valve to the surge tank access panel.

(b)  
Put the test fixture against the relief valve with MS29513-154 0-ring seal installed in the test fixture flange groove.

NOTE: MS29513-154 O-ring seal is part of test fixture assembly.

(c)  
Attach the test fixture to the relief valve using four MS16998-31 screws in place of the regular mounting screws removed in 3.B.(2)(a).


NOTE:  MS16998-31 screws are part of test fixture assembly.
(3)  
Attach hose of the pressure gage or water safety relief manometer to the adapter fitting at bottom of the F80166-1 test fixture. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 燃油 FUEL(76)