1EFF : 062-099, 1 34-43-00Page 312 1 1 Aug 01/05 1 1 1CES 1 1EFF : 062-099, 1 34-43-00Page 313 1 1 Aug 01/05 1 1 1CES 1R Subtask 34-43-00-865-106
R Subtask 34-43-00-860-109
R B. On the PORTABLE DATA LOADER (YV68A110), make sure that the ON/OFF switch
R is at OFF.
R Subtask 34-43-00-010-057
R C. Get Access
R (1) Put the ACCESS PLATFORM 1M (3 FT) in position at the access door 824
R in zone 128.
R (2) Open the access door 824.
R Subtask 34-43-00-865-105
R D. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 121VU COM NAV/TCAS 4SG K10
R Subtask 34-43-00-860-110
R E. Aircraft Maintenance Configuration
R (1) On the panel 188VU
R (Ref. Fig. 301/TASK 34-43-00-991-001)
R (a) Remove the blanking cap from the DATA LOADER connector 194VC.
R (b) Connect the cable of the portable data loader to the DATA LOADER
R connector 194VC.
R (2) Make sure that the aircraft is in ground configuration.
R F. Make sure that this(these) circuit breaker(s) is(are) closed:
R -------------------------------------------------------------------------------R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------R 49VU AUTO FLT/MCDU/1 11CA1 B01
R 49VU L/G/LGCIU/SYS1/NORM 1GA C09
R 121VU CFDS/CFDIU/SPLY 2TW J18
R 121VU CFDS/CFDIU/BACK/UP 8TW J17
R 121VU AUTO FLT/MCDU/2 11CA2 N20
R 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35
R Subtask 34-43-00-865-107
R G. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 4SG.
R 4. Procedure
_________
R Subtask 34-43-00-970-060
R A. Loading of the Operational Software
R NOTE : After the uploading operations, you must do a check on the MCDU,
____ R of the reference of the data loaded in the computer.
R -------------------------------------------------------------------------------R ACTION RESULT R -------------------------------------------------------------------------------
R 1. On the portable data loader:
R - set the ON/OFF switch to ON. R
R - put the disk into the disk R drive, the label in the forward R direction. R R On the portable data loader:
-
the < < MDDU READY > > indication comes into view.
-
the READY indication comes into view
-
then, the WAIT RESPONSE indication comes into view
-
then, the TRANSF IN PROG indication comes into view.
1EFF : 062-099, 1 34-43-00Page 314 1 1 Aug 01/05 1 1 1CES 1 1EFF : 062-099, 1 34-43-00Page 315 1 1 Aug 01/05 1 1 1CES 1 1EFF : 062-099, 1 34-43-00Page 316 1 1 Aug 01/05 1 1 1CES 1R TRAFFIC COLLISION AVOIDANCE SYSTEM (TCAS) - DEACTIVATION/REACTIVATION
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R NOTE : If more than one disk is____
R necessary, the EJECT DISK and
R INSERT NEXT DISK indications
R come into view one after the
R other. They tell you to put a
R new disk in the portable data
R loader.
R - when all the data are in the
R computer, the TRANSF COMPLETE
R indication comes into view.
R - eject the disk from the disk - the < < MDDU READY > > indication
R drive. comes into view.
R Subtask 34-43-00-280-062
R B. On the MCDU Check of the Reference of the Data Loaded in the TCAS
R (1) On the center pedestal, on one MCDU, get the SYSTEM REPORT/TEST/NAV
R page (Ref. TASK 31-32-00-860-010).
R (2) Do a check of the identification of the loaded disk.
R -------------------------------------------------------------------------------
R ACTION RESULT
R -------------------------------------------------------------------------------
R 1. On the MCDU: On the MCDU:
R - push the line key adjacent to - the TCAS page comes into view.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NAVIGATION 导航3(138)