R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU COM NAV/MMR/2 42RT2 L07 **ON A/C 001-049, 051-061, 101-105, 201-203,
 121VU COM NAV/MMR/2 42RT2 K09 **ON A/C ALL
 4. Procedure
_________
 Subtask 34-36-00-710-057

 A. Operational Test of the ILS
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the RMP1 (RMP2):
-push the NAV pushbutton switch.
-set the local frequency of an ILS 1 (ILS 2) beacon with the dual selector knob.
 -push the transfer (double
arrow) pushbutton switch.

2. On the center pedestal, on one ACP:
On the RMP1 (RMP2):
-
the green LED on the NAV pushbutton switch comes on.

-
the set frequency comes into view inthe right display (STBY/CRS).

-
the set frequency comes into view inthe left display.


 1EFF : ALL 1 34-36-00Page 513 1 1 Config-2 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-release the ILS 1 (ILS 2) - in the loud speakers, you can hear pushbutton switch. the Morse signal of the station.
 3. On the RMP1 (RMP2):  - On the RMP1 (RMP2):
 -push the NAV pushbutton switch.  - the green LED on the NAV pushbutton switch goes off.
 5. Close-up
________
 Subtask 34-36-00-860-061
 A. Put the aircraft back to its initial configuration.
 (1)
 On the center pedestral, on the RMP1 (RMP2), set the ON/OFF switch to OFF.

 (2)
 On the center pedestral, on the ACP, push the ILS1 (ILS2) pushbutton switch.

 (3)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).


 (4)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 34-36-00Page 514 1 1 Config-2 May 01/05R 1 1 1CES 1


 TASK 34-36-00-720-002 Functional Test of the ILS
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific VOR-ILS ground test unit
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-002 EIS Stop Procedure 34-10-00-860-004 IR Alignment Procedure
 3. Job Set-up
__________ Subtask 34-36-00-869-063
 A. General
 (1) Use the VOR/ILS Ramp Test Set T30CS or NAV401L. Subtask 34-36-00-860-062
 B. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the IR alignment procedure (Ref. TASK 34-10-00-860-004).


 1EFF : ALL 1 34-36-00Page 515 1 1 Config-2 May 01/05R 1 1 1CES 1


 (3)
 On the CAPT and F/O EFIS control sections of the FCU, push the ILS pushbutton switches. Set the mode selector switches to ROSE/ILS.

 (4)
 On the center pedestal, on the RMP1 (RMP2), set the ON/OFF switch to ON.


 Subtask 34-36-00-865-061
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU NAV/MMR/1 42RT1 G12

R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 121VU COM NAV/MMR/2 42RT2 L07 **ON A/C 001-049, 051-061, 101-105, 201-203,
 121VU COM NAV/MMR/2 42RT2 K09 **ON A/C ALL
 Subtask 34-36-00-480-051
 D. Install the VOR-ILS ground test unit near the radome. To do this, refer to the installation instructions. Set the ON/OFF switch to ON.
 1EFF : ALL 1 34-36-00Page 516 1 1 Config-2 Aug 01/05 1 1 1CES 1


 4. Procedure
_________ Subtask 34-36-00-720-052
 